Leaves on the Line

Dorking

DKG Sussex route
CSV JSON

493 delay minutes

The biggest share (41%) of the delay picked up at Dorking in the four weeks to 9 December 2023 came from how the network was run.

84% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track367%8% 1 a day, more than 1 of the other 4 years-
Signals, points and power8217%16% 3 a day, more than 1 of the other 4 years2
Weather and structures4<1%7% 0 a day, more than 1 of the other 4 years-
Autumn133%7% 0 a day, more than 2 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management20441%17% 7 a day, more than 1 of the other 4 years3
The operators' causes
Train faults469%16% 2 a day, more than 2 of the other 4 years6
Traincrew408%11% 1 a day, the least in 5 years5
Stations173%3% 1 a day, more than 2 of the other 4 years-
Operations--5% 0 a day, the least in 5 years3
Operator, other5110%7% 2 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
I5Possession over-run from planned work51
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)47
OCSignaller including mis-routing (not ERTM /ETCS related)43
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident30
OBDelayed by signaller not applying applicable regulating policy24
VHPassenger Communication cord, door egress or emergency train alarm operated23
IBPoints failure (including no fault found)20
IRBroken/cracked/twisted/buckled/flawed rail20
TGDriver20
M7Door and Door system faults17
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,766
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.3,467
TGDriver2,759
OCSignaller including mis-routing (not ERTM /ETCS related)2,673
OBDelayed by signaller not applying applicable regulating policy1,458
ICTrack circuit failure (including no fault found)1,353
IBPoints failure (including no fault found)1,040
MDTechnical failures below the solebar910
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure733
M8Technical failures above the Solebar624