Dorking
493 delay minutes
The biggest share (41%) of the delay picked up at Dorking in the four weeks to 9 December 2023 came from how the network was run.
84% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 36 | 7% | 8% | 1 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 82 | 17% | 16% | 3 a day, more than 1 of the other 4 years | 2 |
| Weather and structures | 4 | <1% | 7% | 0 a day, more than 1 of the other 4 years | - |
| Autumn | 13 | 3% | 7% | 0 a day, more than 2 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 204 | 41% | 17% | 7 a day, more than 1 of the other 4 years | 3 |
| The operators' causes | |||||
| Train faults | 46 | 9% | 16% | 2 a day, more than 2 of the other 4 years | 6 |
| Traincrew | 40 | 8% | 11% | 1 a day, the least in 5 years | 5 |
| Stations | 17 | 3% | 3% | 1 a day, more than 2 of the other 4 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | 3 |
| Operator, other | 51 | 10% | 7% | 2 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| I5 | Possession over-run from planned work | 51 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 47 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 43 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 30 |
| OB | Delayed by signaller not applying applicable regulating policy | 24 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 23 |
| IB | Points failure (including no fault found) | 20 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 20 |
| TG | Driver | 20 |
| M7 | Door and Door system faults | 17 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 3,766 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 3,467 |
| TG | Driver | 2,759 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 2,673 |
| OB | Delayed by signaller not applying applicable regulating policy | 1,458 |
| IC | Track circuit failure (including no fault found) | 1,353 |
| IB | Points failure (including no fault found) | 1,040 |
| MD | Technical failures below the solebar | 910 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 733 |
| M8 | Technical failures above the Solebar | 624 |