207 delay minutes

The biggest share (23%) of the delay picked up at Dalreoch in the four weeks to 9 December 2023 came from outside causes like vandalism, cable theft, animals and fires.

76% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track2613%8% 1 a day, more than 2 of the other 4 years-
Signals, points and power3014%16% 1 a day, more than 1 of the other 4 years2
Weather and structures--7% 0 a day, the least in 5 years-
Autumn188%7% 1 a day, more than 2 of the other 4 years-
External4823%4% 2 a day, the most in 5 years-
Network management2713%17% 1 a day, more than 1 of the other 4 years-
The operators' causes
Train faults188%16% 1 a day, the least in 5 years-
Traincrew2211%11% 1 a day, more than 2 of the other 4 years-
Stations--3% 0 a day, the least in 5 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other209%7% 1 a day, the least in 5 years2

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)33
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure21
JBReactionary Delay to 'P' coded TSRs19
MPRail / wheel interface, adhesion problems (including ice on the running rail)18
Q3NZ Pumps T18
TGDriver13
MNBrake and brake systems faults; including wheel flats where no other cause had been identified11
OARegulation Decision Made With Best Endeavours8
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)8
OCSignaller including mis-routing (not ERTM /ETCS related)7
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver943
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions850
J3Axle Counter Failure673
M8Technical failures above the Solebar673
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)629
ZUNo Cause Identified After investigation by both Parties548
MDTechnical failures below the solebar480
IBPoints failure (including no fault found)463
ICTrack circuit failure (including no fault found)441
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure420