The biggest share (23%) of the delay picked up at Dalreoch in the four weeks to 9 December 2023 came from outside causes like vandalism, cable theft, animals and fires.
76% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 26 | 13% | 8% | 1 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 30 | 14% | 16% | 1 a day, more than 1 of the other 4 years | 2 |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 18 | 8% | 7% | 1 a day, more than 2 of the other 4 years | - |
| External | 48 | 23% | 4% | 2 a day, the most in 5 years | - |
| Network management | 27 | 13% | 17% | 1 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 18 | 8% | 16% | 1 a day, the least in 5 years | - |
| Traincrew | 22 | 11% | 11% | 1 a day, more than 2 of the other 4 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 20 | 9% | 7% | 1 a day, the least in 5 years | 2 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 33 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 21 |
| JB | Reactionary Delay to 'P' coded TSRs | 19 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 18 |
| Q3 | NZ Pumps T | 18 |
| TG | Driver | 13 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 11 |
| OA | Regulation Decision Made With Best Endeavours | 8 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 8 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 7 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 943 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 850 |
| J3 | Axle Counter Failure | 673 |
| M8 | Technical failures above the Solebar | 673 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 629 |
| ZU | No Cause Identified After investigation by both Parties | 548 |
| MD | Technical failures below the solebar | 480 |
| IB | Points failure (including no fault found) | 463 |
| IC | Track circuit failure (including no fault found) | 441 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 420 |