Dalwhinnie
711 delay minutes
Most of the delay picked up at Dalwhinnie in the four weeks to 9 December 2023 came from weather and structures.
53% of these minutes were knock-on from something that happened elsewhere first. 73% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 62 | 9% | 8% | 2 a day, the most in 5 years | - |
| Signals, points and power | 94 | 13% | 16% | 3 a day, the most in 5 years | - |
| Weather and structures | 364 | 51% | 7% | 13 a day, the most in 5 years | - |
| Autumn | 9 | 1% | 7% | 0 a day, more than 2 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 110 | 15% | 17% | 4 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 38 | 5% | 16% | 1 a day, more than 1 of the other 4 years | - |
| Traincrew | 22 | 3% | 11% | 1 a day, more than 2 of the other 4 years | - |
| Stations | 4 | <1% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 9 | 1% | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JK | Flooding not due to exceptional weather | 188 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 159 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 64 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 62 |
| IA | Signal failure (including no fault found) | 47 |
| IG | Block failure | 42 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 26 |
| ZU | No Cause Identified After investigation by both Parties | 17 |
| TI | Traincrew rostering problem | 14 |
| IW | Non severe weather - snow/ice/frost affecting infrastructure equipment excluding points | 13 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZU | No Cause Identified After investigation by both Parties | 2,244 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 1,948 |
| MD | Technical failures below the solebar | 1,407 |
| IC | Track circuit failure (including no fault found) | 1,365 |
| MC | Diesel Loco failure, defect, attention | 1,222 |
| TG | Driver | 797 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 772 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 729 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 713 |
| XT | Severe snow or ice affecting infrastructure which is the responsibility of NR (including implementation of Key Route Strategy) | 657 |