5,135 delay minutes
The biggest share (23%) of the delay picked up at Doncaster in the four weeks to 9 December 2023 came from signal, points and power faults.
48% of these minutes were knock-on from something that happened elsewhere first. 79% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 114 | 2% | 8% | 4 a day, more than 1 of the other 4 years | 1 |
| Signals, points and power | 1,204 | 23% | 16% | 43 a day, the most in 5 years | 18 |
| Weather and structures | 550 | 11% | 7% | 20 a day, more than 3 of the other 4 years | 20 |
| Autumn | 340 | 7% | 7% | 12 a day, the most in 5 years | - |
| External | 799 | 16% | 4% | 29 a day, the most in 5 years | 9 |
| Network management | 756 | 15% | 17% | 27 a day, more than 3 of the other 4 years | 91 |
| The operators' causes | |||||
| Train faults | 666 | 13% | 16% | 24 a day, more than 1 of the other 4 years | 16 |
| Traincrew | 310 | 6% | 11% | 11 a day, more than 2 of the other 4 years | 49 |
| Stations | 158 | 3% | 3% | 6 a day, more than 2 of the other 4 years | 3 |
| Operations | 104 | 2% | 5% | 4 a day, the least in 5 years | 1 |
| Operator, other | 136 | 3% | 7% | 5 a day, more than 1 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| I1 | Overhead line/third rail defect | 873 |
| XR | Cable vandalism or theft | 619 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 463 |
| QJ | Special working for leaf-fall track circuit operation | 291 |
| OU | Delays not Investigated by Network Rail | 257 |
| I5 | Possession over-run from planned work | 256 |
| TG | Driver | 174 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 143 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 134 |
| MD | Technical failures below the solebar | 133 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 11,329 |
| MD | Technical failures below the solebar | 9,670 |
| I1 | Overhead line/third rail defect | 7,997 |
| IB | Points failure (including no fault found) | 7,457 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 5,341 |
| IC | Track circuit failure (including no fault found) | 5,268 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 5,004 |
| M8 | Technical failures above the Solebar | 4,980 |
| TH | (Senior) Conductor/Train Manager | 4,285 |
| MU | Depot operating problem | 4,004 |