Drem
449 delay minutes
The biggest share (26%) of the delay picked up at Drem in the four weeks to 9 December 2023 came from weather and structures.
78% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 46 | 10% | 8% | 2 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 78 | 17% | 16% | 3 a day, the least in 5 years | - |
| Weather and structures | 115 | 26% | 7% | 4 a day, more than 2 of the other 4 years | - |
| Autumn | 10 | 2% | 7% | 0 a day, the least in 5 years | - |
| External | 12 | 3% | 4% | 0 a day, more than 1 of the other 4 years | - |
| Network management | 78 | 17% | 17% | 3 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 23 | 5% | 16% | 1 a day, the least in 5 years | - |
| Traincrew | 27 | 6% | 11% | 1 a day, more than 1 of the other 4 years | - |
| Stations | 23 | 5% | 3% | 1 a day, more than 2 of the other 4 years | - |
| Operations | 30 | 7% | 5% | 1 a day, more than 2 of the other 4 years | - |
| Operator, other | 8 | 2% | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 51 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 46 |
| JK | Flooding not due to exceptional weather | 38 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 36 |
| TG | Driver | 27 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 26 |
| I5 | Possession over-run from planned work | 24 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 18 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 17 |
| IB | Points failure (including no fault found) | 14 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 2,998 |
| TG | Driver | 1,479 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,203 |
| I1 | Overhead line/third rail defect | 1,044 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 1,030 |
| MD | Technical failures below the solebar | 1,014 |
| IB | Points failure (including no fault found) | 911 |
| X8 | Animal Strike or incursion not within the control of Network Rail | 908 |
| M8 | Technical failures above the Solebar | 885 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 845 |