Leaves on the Line

Drumgelloch

DRU Scotland route
CSV JSON

185 delay minutes

The biggest share (29%) of the delay picked up at Drumgelloch in the four weeks to 9 December 2023 came from other operator causes.

57% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track169%8% 1 a day, the most in 5 years-
Signals, points and power2614%16% 1 a day, more than 2 of the other 4 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn1910%7% 1 a day, more than 3 of the other 4 years-
External63%4% 0 a day, more than 2 of the other 4 years-
Network management169%17% 1 a day, more than 2 of the other 4 years-
The operators' causes
Train faults1810%16% 1 a day, more than 1 of the other 4 years1
Traincrew2715%11% 1 a day, the most in 5 years-
Stations21%3% 0 a day, more than 1 of the other 4 years-
Operations21%5% 0 a day, more than 2 of the other 4 years-
Operator, other5429%7% 2 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver27
IBPoints failure (including no fault found)24
MPRail / wheel interface, adhesion problems (including ice on the running rail)19
Q3NZ Pumps T19
VBVandalism or theft18
VHPassenger Communication cord, door egress or emergency train alarm operated17
JBReactionary Delay to 'P' coded TSRs9
M8Technical failures above the Solebar9
MUDepot operating problem9
OMTechnical failure associated with a Railhead conditioning train8
Since 2018
CodeWhat Network Rail loggedMinutes
VWSevere weather affecting passenger Fleet equipment including follwogin company standards/policies or Rule book instructions933
VHPassenger Communication cord, door egress or emergency train alarm operated761
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure615
IBPoints failure (including no fault found)592
TGDriver547
M8Technical failures above the Solebar529
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions514
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)392
XBVandalism or theft (including the placing of objects on the line)288
MNBrake and brake systems faults; including wheel flats where no other cause had been identified284