Drumgelloch
185 delay minutes
The biggest share (29%) of the delay picked up at Drumgelloch in the four weeks to 9 December 2023 came from other operator causes.
57% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 16 | 9% | 8% | 1 a day, the most in 5 years | - |
| Signals, points and power | 26 | 14% | 16% | 1 a day, more than 2 of the other 4 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 19 | 10% | 7% | 1 a day, more than 3 of the other 4 years | - |
| External | 6 | 3% | 4% | 0 a day, more than 2 of the other 4 years | - |
| Network management | 16 | 9% | 17% | 1 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 18 | 10% | 16% | 1 a day, more than 1 of the other 4 years | 1 |
| Traincrew | 27 | 15% | 11% | 1 a day, the most in 5 years | - |
| Stations | 2 | 1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 2 | 1% | 5% | 0 a day, more than 2 of the other 4 years | - |
| Operator, other | 54 | 29% | 7% | 2 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 27 |
| IB | Points failure (including no fault found) | 24 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 19 |
| Q3 | NZ Pumps T | 19 |
| VB | Vandalism or theft | 18 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 17 |
| JB | Reactionary Delay to 'P' coded TSRs | 9 |
| M8 | Technical failures above the Solebar | 9 |
| MU | Depot operating problem | 9 |
| OM | Technical failure associated with a Railhead conditioning train | 8 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| VW | Severe weather affecting passenger Fleet equipment including follwogin company standards/policies or Rule book instructions | 933 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 761 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 615 |
| IB | Points failure (including no fault found) | 592 |
| TG | Driver | 547 |
| M8 | Technical failures above the Solebar | 529 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 514 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 392 |
| XB | Vandalism or theft (including the placing of objects on the line) | 288 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 284 |