Dunbar

DUN Scotland route
CSV JSON

804 delay minutes

Most of the delay picked up at Dunbar in the four weeks to 9 December 2023 came from track faults.

35% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track41852%8% 15 a day, the most in 5 years-
Signals, points and power101%16% 0 a day, the least in 5 years-
Weather and structures11114%7% 4 a day, more than 2 of the other 4 years-
Autumn375%7% 1 a day, the most in 5 years-
External132%4% 0 a day, the most in 5 years-
Network management658%17% 2 a day, more than 3 of the other 4 years-
The operators' causes
Train faults223%16% 1 a day, more than 2 of the other 4 years-
Traincrew283%11% 1 a day, more than 2 of the other 4 years-
Stations3<1%3% 0 a day, more than 2 of the other 4 years-
Operations385%5% 1 a day, the most in 5 years-
Operator, other607%7% 2 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IRBroken/cracked/twisted/buckled/flawed rail357
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.61
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions61
Q3NZ Pumps T37
MPRail / wheel interface, adhesion problems (including ice on the running rail)34
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)31
Q1Takeback Pumps19
FOTime Lost en-route believed to be operator cause and information required from Operator (Ops Responsibility)17
FWLate start/yard overtime not explained by Operator15
TRTrain Operating Company Directive13
Since 2018
CodeWhat Network Rail loggedMinutes
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions3,756
I1Overhead line/third rail defect1,833
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure1,325
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail1,298
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.772
ICTrack circuit failure (including no fault found)715
IHPower Supply And Distribution System Failure707
IISignalling lineside cable fault679
MNBrake and brake systems faults; including wheel flats where no other cause had been identified675
IESignalling Functional Power Supply Failure644