Dunbar
804 delay minutes
Most of the delay picked up at Dunbar in the four weeks to 9 December 2023 came from track faults.
35% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 418 | 52% | 8% | 15 a day, the most in 5 years | - |
| Signals, points and power | 10 | 1% | 16% | 0 a day, the least in 5 years | - |
| Weather and structures | 111 | 14% | 7% | 4 a day, more than 2 of the other 4 years | - |
| Autumn | 37 | 5% | 7% | 1 a day, the most in 5 years | - |
| External | 13 | 2% | 4% | 0 a day, the most in 5 years | - |
| Network management | 65 | 8% | 17% | 2 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 22 | 3% | 16% | 1 a day, more than 2 of the other 4 years | - |
| Traincrew | 28 | 3% | 11% | 1 a day, more than 2 of the other 4 years | - |
| Stations | 3 | <1% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | 38 | 5% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 60 | 7% | 7% | 2 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IR | Broken/cracked/twisted/buckled/flawed rail | 357 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 61 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 61 |
| Q3 | NZ Pumps T | 37 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 34 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 31 |
| Q1 | Takeback Pumps | 19 |
| FO | Time Lost en-route believed to be operator cause and information required from Operator (Ops Responsibility) | 17 |
| FW | Late start/yard overtime not explained by Operator | 15 |
| TR | Train Operating Company Directive | 13 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 3,756 |
| I1 | Overhead line/third rail defect | 1,833 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 1,325 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 1,298 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 772 |
| IC | Track circuit failure (including no fault found) | 715 |
| IH | Power Supply And Distribution System Failure | 707 |
| II | Signalling lineside cable fault | 679 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 675 |
| IE | Signalling Functional Power Supply Failure | 644 |