Most of the delay picked up at Dyce in the four weeks to 9 December 2023 came from weather and structures.

21% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track62%8% 0 a day, more than 2 of the other 4 years-
Signals, points and power185%16% 1 a day, more than 1 of the other 4 years-
Weather and structures23772%7% 8 a day, more than 3 of the other 4 years2
Autumn72%7% 0 a day, more than 3 of the other 4 years-
External165%4% 1 a day, more than 2 of the other 4 years-
Network management93%17% 0 a day, the least in 5 years1
The operators' causes
Train faults134%16% 0 a day, the least in 5 years-
Traincrew41%11% 0 a day, more than 1 of the other 4 years-
Stations62%3% 0 a day, more than 1 of the other 4 years-
Operations62%5% 0 a day, more than 3 of the other 4 years-
Operator, other72%7% 0 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure215
ICTrack circuit failure (including no fault found)16
M7Door and Door system faults13
IWNon severe weather - snow/ice/frost affecting infrastructure equipment excluding points11
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions11
XPBRIDGE HIT9
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)7
MPRail / wheel interface, adhesion problems (including ice on the running rail)7
Q3NZ Pumps T7
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)7
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver877
ZUNo Cause Identified After investigation by both Parties707
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure603
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles583
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions529
MDTechnical failures below the solebar479
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)470
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure465
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail346
IBPoints failure (including no fault found)333