Dyce
329 delay minutes
Most of the delay picked up at Dyce in the four weeks to 9 December 2023 came from weather and structures.
21% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 6 | 2% | 8% | 0 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 18 | 5% | 16% | 1 a day, more than 1 of the other 4 years | - |
| Weather and structures | 237 | 72% | 7% | 8 a day, more than 3 of the other 4 years | 2 |
| Autumn | 7 | 2% | 7% | 0 a day, more than 3 of the other 4 years | - |
| External | 16 | 5% | 4% | 1 a day, more than 2 of the other 4 years | - |
| Network management | 9 | 3% | 17% | 0 a day, the least in 5 years | 1 |
| The operators' causes | |||||
| Train faults | 13 | 4% | 16% | 0 a day, the least in 5 years | - |
| Traincrew | 4 | 1% | 11% | 0 a day, more than 1 of the other 4 years | - |
| Stations | 6 | 2% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 6 | 2% | 5% | 0 a day, more than 3 of the other 4 years | - |
| Operator, other | 7 | 2% | 7% | 0 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 215 |
| IC | Track circuit failure (including no fault found) | 16 |
| M7 | Door and Door system faults | 13 |
| IW | Non severe weather - snow/ice/frost affecting infrastructure equipment excluding points | 11 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 11 |
| XP | BRIDGE HIT | 9 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 7 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 7 |
| Q3 | NZ Pumps T | 7 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 7 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 877 |
| ZU | No Cause Identified After investigation by both Parties | 707 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 603 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 583 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 529 |
| MD | Technical failures below the solebar | 479 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 470 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 465 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 346 |
| IB | Points failure (including no fault found) | 333 |