Eastbourne

EBN Sussex route
CSV JSON

1,580 delay minutes

The biggest share (34%) of the delay picked up at Eastbourne in the four weeks to 9 December 2023 came from signal, points and power faults.

79% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track322%8% 1 a day, more than 1 of the other 4 years1
Signals, points and power53634%16% 19 a day, the most in 5 years1
Weather and structures755%7% 3 a day, more than 3 of the other 4 years1
Autumn16<1%7% 1 a day, more than 3 of the other 4 years-
External584%4% 2 a day, the most in 5 years2
Network management51232%17% 18 a day, the most in 5 years33
The operators' causes
Train faults1187%16% 4 a day, more than 2 of the other 4 years5
Traincrew1006%11% 4 a day, the least in 5 years8
Stations3<1%3% 0 a day, more than 1 of the other 4 years-
Operations805%5% 3 a day, more than 3 of the other 4 years-
Operator, other513%7% 2 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IGBlock failure229
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)150
OCSignaller including mis-routing (not ERTM /ETCS related)148
J0Telecom equipment radio failure (GSM-R)98
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)82
TGDriver80
IKTelecom equipment failure (including no fault found)70
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)66
IBPoints failure (including no fault found)63
M8Technical failures above the Solebar61
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver6,397
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.3,583
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,576
TITraincrew rostering problem2,993
ICTrack circuit failure (including no fault found)2,229
M8Technical failures above the Solebar2,195
OCSignaller including mis-routing (not ERTM /ETCS related)1,927
TH(Senior) Conductor/Train Manager1,412
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles1,341
J3Axle Counter Failure1,289