Leaves on the Line

East Croydon

ECR Sussex route
CSV JSON

3,496 delay minutes

The biggest share (38%) of the delay picked up at East Croydon in the four weeks to 9 December 2023 came from how the network was run.

73% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1946%8% 7 a day, more than 1 of the other 4 years1
Signals, points and power67719%16% 24 a day, more than 1 of the other 4 years12
Weather and structures1043%7% 4 a day, more than 2 of the other 4 years-
Autumn25<1%7% 1 a day, more than 1 of the other 4 years1
External1936%4% 7 a day, more than 3 of the other 4 years1
Network management1,33038%17% 48 a day, the least in 5 years5
The operators' causes
Train faults2136%16% 8 a day, the least in 5 years9
Traincrew33610%11% 12 a day, the least in 5 years8
Stations1645%3% 6 a day, more than 2 of the other 4 years-
Operations501%5% 2 a day, the least in 5 years-
Operator, other2116%7% 8 a day, the least in 5 years2

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)496
TGDriver235
OBDelayed by signaller not applying applicable regulating policy215
OCSignaller including mis-routing (not ERTM /ETCS related)194
IBPoints failure (including no fault found)157
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)154
IISignalling lineside cable fault118
IRBroken/cracked/twisted/buckled/flawed rail113
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure109
VHPassenger Communication cord, door egress or emergency train alarm operated102
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)41,637
TGDriver30,901
OCSignaller including mis-routing (not ERTM /ETCS related)26,218
OBDelayed by signaller not applying applicable regulating policy24,896
ICTrack circuit failure (including no fault found)13,940
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.10,117
IRBroken/cracked/twisted/buckled/flawed rail9,535
M8Technical failures above the Solebar9,027
IBPoints failure (including no fault found)7,884
VHPassenger Communication cord, door egress or emergency train alarm operated7,833