Edinburgh
5,696 delay minutes
The biggest share (34%) of the delay picked up at Edinburgh in the four weeks to 9 December 2023 came from faulty trains.
82% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 161 | 3% | 8% | 6 a day, the least in 5 years | 2 |
| Signals, points and power | 612 | 11% | 16% | 22 a day, more than 1 of the other 4 years | 20 |
| Weather and structures | 819 | 14% | 7% | 29 a day, more than 3 of the other 4 years | 19 |
| Autumn | 264 | 5% | 7% | 9 a day, more than 2 of the other 4 years | 1 |
| External | 89 | 2% | 4% | 3 a day, the least in 5 years | 2 |
| Network management | 405 | 7% | 17% | 14 a day, the least in 5 years | 271 |
| The operators' causes | |||||
| Train faults | 1,958 | 34% | 16% | 70 a day, more than 2 of the other 4 years | 56 |
| Traincrew | 676 | 12% | 11% | 24 a day, more than 1 of the other 4 years | 52 |
| Stations | 184 | 3% | 3% | 7 a day, the least in 5 years | 2 |
| Operations | 219 | 4% | 5% | 8 a day, the least in 5 years | 9 |
| Operator, other | 310 | 5% | 7% | 11 a day, more than 1 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 499 |
| ML | Wagons, coaches and parcel vehicle faults | 384 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 375 |
| M8 | Technical failures above the Solebar | 255 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 226 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 209 |
| JK | Flooding not due to exceptional weather | 190 |
| Q3 | NZ Pumps T | 190 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 187 |
| MC | Diesel Loco failure, defect, attention | 167 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 34,472 |
| M8 | Technical failures above the Solebar | 19,196 |
| MD | Technical failures below the solebar | 14,978 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 12,178 |
| MU | Depot operating problem | 11,358 |
| M7 | Door and Door system faults | 10,050 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 9,642 |
| IB | Points failure (including no fault found) | 9,575 |
| RD | Attaching/detaching/shunter/watering | 9,276 |
| I1 | Overhead line/third rail defect | 8,055 |