Leaves on the Line

East Grinstead

EGR Sussex route
CSV JSON

917 delay minutes

The biggest share (33%) of the delay picked up at East Grinstead in the four weeks to 9 December 2023 came from signal, points and power faults.

89% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track101%8% 0 a day, the least in 5 years-
Signals, points and power30433%16% 11 a day, the most in 5 years2
Weather and structures142%7% 1 a day, the least in 5 years-
Autumn435%7% 2 a day, more than 3 of the other 4 years-
External323%4% 1 a day, more than 3 of the other 4 years1
Network management26028%17% 9 a day, more than 2 of the other 4 years101
The operators' causes
Train faults445%16% 2 a day, more than 1 of the other 4 years3
Traincrew11012%11% 4 a day, more than 1 of the other 4 years2
Stations526%3% 2 a day, the most in 5 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other495%7% 2 a day, more than 1 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)184
TGDriver94
IISignalling lineside cable fault68
J0Telecom equipment radio failure (GSM-R)57
ICTrack circuit failure (including no fault found)53
IBPoints failure (including no fault found)48
I1Overhead line/third rail defect41
RXStation delay due overcrowding due unplanned events or incident (line or station closure) where causal event is not determined34
VHPassenger Communication cord, door egress or emergency train alarm operated28
OCSignaller including mis-routing (not ERTM /ETCS related)23
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)5,573
TGDriver4,644
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,549
ICTrack circuit failure (including no fault found)2,330
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)1,741
IRBroken/cracked/twisted/buckled/flawed rail1,479
M8Technical failures above the Solebar1,403
OCSignaller including mis-routing (not ERTM /ETCS related)1,310
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,257
VHPassenger Communication cord, door egress or emergency train alarm operated1,139