East Grinstead
917 delay minutes
The biggest share (33%) of the delay picked up at East Grinstead in the four weeks to 9 December 2023 came from signal, points and power faults.
89% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 10 | 1% | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 304 | 33% | 16% | 11 a day, the most in 5 years | 2 |
| Weather and structures | 14 | 2% | 7% | 1 a day, the least in 5 years | - |
| Autumn | 43 | 5% | 7% | 2 a day, more than 3 of the other 4 years | - |
| External | 32 | 3% | 4% | 1 a day, more than 3 of the other 4 years | 1 |
| Network management | 260 | 28% | 17% | 9 a day, more than 2 of the other 4 years | 101 |
| The operators' causes | |||||
| Train faults | 44 | 5% | 16% | 2 a day, more than 1 of the other 4 years | 3 |
| Traincrew | 110 | 12% | 11% | 4 a day, more than 1 of the other 4 years | 2 |
| Stations | 52 | 6% | 3% | 2 a day, the most in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 49 | 5% | 7% | 2 a day, more than 1 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 184 |
| TG | Driver | 94 |
| II | Signalling lineside cable fault | 68 |
| J0 | Telecom equipment radio failure (GSM-R) | 57 |
| IC | Track circuit failure (including no fault found) | 53 |
| IB | Points failure (including no fault found) | 48 |
| I1 | Overhead line/third rail defect | 41 |
| RX | Station delay due overcrowding due unplanned events or incident (line or station closure) where causal event is not determined | 34 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 28 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 23 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 5,573 |
| TG | Driver | 4,644 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,549 |
| IC | Track circuit failure (including no fault found) | 2,330 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 1,741 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 1,479 |
| M8 | Technical failures above the Solebar | 1,403 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,310 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,257 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 1,139 |