Leaves on the Line

East Kilbride

EKL Scotland route
CSV JSON

246 delay minutes

The biggest share (37%) of the delay picked up at East Kilbride in the four weeks to 9 December 2023 came from how the network was run.

96% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power52%16% 0 a day, more than 1 of the other 4 years-
Weather and structures62%7% 0 a day, more than 1 of the other 4 years-
Autumn3313%7% 1 a day, the most in 5 years-
External--4% 0 a day, the least in 5 years-
Network management9237%17% 3 a day, the most in 5 years-
The operators' causes
Train faults4618%16% 2 a day, more than 2 of the other 4 years4
Traincrew198%11% 1 a day, more than 1 of the other 4 years-
Stations187%3% 1 a day, more than 1 of the other 4 years-
Operations31%5% 0 a day, the least in 5 years-
Operator, other2610%7% 1 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
QMTrain schedule/STP Process including erroneous simplifiers33
MPRail / wheel interface, adhesion problems (including ice on the running rail)26
Q3NZ Pumps T26
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)19
TGDriver19
ZUNo Cause Identified After investigation by both Parties19
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident18
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)17
M7Door and Door system faults16
MBElectic Loco failure, defect, attention7
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver901
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)899
RBPassengers joining/alighting729
M8Technical failures above the Solebar666
M7Door and Door system faults547
MDTechnical failures below the solebar496
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)482
MNBrake and brake systems faults; including wheel flats where no other cause had been identified307
IBPoints failure (including no fault found)301
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure293