East Kilbride
246 delay minutes
The biggest share (37%) of the delay picked up at East Kilbride in the four weeks to 9 December 2023 came from how the network was run.
96% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 5 | 2% | 16% | 0 a day, more than 1 of the other 4 years | - |
| Weather and structures | 6 | 2% | 7% | 0 a day, more than 1 of the other 4 years | - |
| Autumn | 33 | 13% | 7% | 1 a day, the most in 5 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 92 | 37% | 17% | 3 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 46 | 18% | 16% | 2 a day, more than 2 of the other 4 years | 4 |
| Traincrew | 19 | 8% | 11% | 1 a day, more than 1 of the other 4 years | - |
| Stations | 18 | 7% | 3% | 1 a day, more than 1 of the other 4 years | - |
| Operations | 3 | 1% | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 26 | 10% | 7% | 1 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QM | Train schedule/STP Process including erroneous simplifiers | 33 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 26 |
| Q3 | NZ Pumps T | 26 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 19 |
| TG | Driver | 19 |
| ZU | No Cause Identified After investigation by both Parties | 19 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 18 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 17 |
| M7 | Door and Door system faults | 16 |
| MB | Electic Loco failure, defect, attention | 7 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 901 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 899 |
| RB | Passengers joining/alighting | 729 |
| M8 | Technical failures above the Solebar | 666 |
| M7 | Door and Door system faults | 547 |
| MD | Technical failures below the solebar | 496 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 482 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 307 |
| IB | Points failure (including no fault found) | 301 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 293 |