Earlswood (Surrey)
6,564 delay minutes
The biggest share (47%) of the delay picked up at Earlswood (Surrey) in the four weeks to 9 December 2023 came from track faults.
49% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 3,079 | 47% | 8% | 110 a day, the most in 5 years | - |
| Signals, points and power | 766 | 12% | 16% | 27 a day, more than 1 of the other 4 years | - |
| Weather and structures | 161 | 2% | 7% | 6 a day, more than 2 of the other 4 years | - |
| Autumn | 13 | <1% | 7% | 0 a day, the least in 5 years | - |
| External | 332 | 5% | 4% | 12 a day, more than 3 of the other 4 years | - |
| Network management | 1,157 | 18% | 17% | 41 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 126 | 2% | 16% | 5 a day, the least in 5 years | - |
| Traincrew | 351 | 5% | 11% | 13 a day, the least in 5 years | - |
| Stations | 346 | 5% | 3% | 12 a day, the most in 5 years | - |
| Operations | 142 | 2% | 5% | 5 a day, the most in 5 years | - |
| Operator, other | 91 | 1% | 7% | 3 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 3,010 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 291 |
| XB | Vandalism or theft (including the placing of objects on the line) | 287 |
| RE | Lift/escalator defect/failure | 279 |
| II | Signalling lineside cable fault | 235 |
| TG | Driver | 218 |
| IB | Points failure (including no fault found) | 207 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 186 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 181 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 142 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 33,392 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 24,669 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 24,014 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 23,203 |
| TG | Driver | 20,509 |
| IC | Track circuit failure (including no fault found) | 17,413 |
| OB | Delayed by signaller not applying applicable regulating policy | 13,166 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 12,740 |
| IB | Points failure (including no fault found) | 11,803 |
| M8 | Technical failures above the Solebar | 10,367 |