Epsom Downs
323 delay minutes
The biggest share (29%) of the delay picked up at Epsom Downs in the four weeks to 9 December 2023 came from faulty trains.
81% of these minutes were knock-on from something that happened elsewhere first. 78% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 65 | 20% | 16% | 2 a day, more than 2 of the other 4 years | 1 |
| Weather and structures | 2 | <1% | 7% | 0 a day, more than 3 of the other 4 years | - |
| Autumn | - | - | 7% | 0 a day, the least in 5 years | - |
| External | 8 | 2% | 4% | 0 a day, more than 3 of the other 4 years | 5 |
| Network management | 86 | 27% | 17% | 3 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 94 | 29% | 16% | 3 a day, more than 3 of the other 4 years | 4 |
| Traincrew | 35 | 11% | 11% | 1 a day, the least in 5 years | 1 |
| Stations | 10 | 3% | 3% | 0 a day, more than 3 of the other 4 years | - |
| Operations | 3 | <1% | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 20 | 6% | 7% | 1 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MQ | Confirmed shoe beam or associated system faults Incl. train borne power switch over systems (DC) | 55 |
| I1 | Overhead line/third rail defect | 51 |
| TG | Driver | 35 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 34 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 28 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 20 |
| M8 | Technical failures above the Solebar | 16 |
| MD | Technical failures below the solebar | 15 |
| J0 | Telecom equipment radio failure (GSM-R) | 14 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 12 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 2,743 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,172 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 578 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 569 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 507 |
| MD | Technical failures below the solebar | 448 |
| M8 | Technical failures above the Solebar | 409 |
| M7 | Door and Door system faults | 383 |
| IC | Track circuit failure (including no fault found) | 367 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 311 |