Falkirk Grahamston
534 delay minutes
The biggest share (18%) of the delay picked up at Falkirk Grahamston in the four weeks to 9 December 2023 came from other operator causes.
91% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 41 | 8% | 8% | 1 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 70 | 13% | 16% | 3 a day, more than 1 of the other 4 years | 1 |
| Weather and structures | 77 | 14% | 7% | 3 a day, more than 3 of the other 4 years | - |
| Autumn | 43 | 8% | 7% | 2 a day, more than 3 of the other 4 years | - |
| External | 16 | 3% | 4% | 1 a day, more than 1 of the other 4 years | - |
| Network management | 41 | 8% | 17% | 1 a day, more than 1 of the other 4 years | 4 |
| The operators' causes | |||||
| Train faults | 74 | 14% | 16% | 3 a day, more than 1 of the other 4 years | - |
| Traincrew | 40 | 7% | 11% | 1 a day, more than 2 of the other 4 years | - |
| Stations | 12 | 2% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 25 | 5% | 5% | 1 a day, more than 1 of the other 4 years | - |
| Operator, other | 95 | 18% | 7% | 3 a day, the most in 5 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 55 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 44 |
| Q3 | NZ Pumps T | 43 |
| TG | Driver | 35 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 30 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 27 |
| MC | Diesel Loco failure, defect, attention | 23 |
| VW | Severe weather affecting passenger Fleet equipment including follwogin company standards/policies or Rule book instructions | 22 |
| JK | Flooding not due to exceptional weather | 15 |
| I2 | AC/DC trip (including no fault or cause found) | 14 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 2,377 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 2,055 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 1,957 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,451 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 1,182 |
| IB | Points failure (including no fault found) | 1,178 |
| M8 | Technical failures above the Solebar | 1,085 |
| M7 | Door and Door system faults | 951 |
| MD | Technical failures below the solebar | 935 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 764 |