534 delay minutes

The biggest share (18%) of the delay picked up at Falkirk Grahamston in the four weeks to 9 December 2023 came from other operator causes.

91% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track418%8% 1 a day, more than 2 of the other 4 years-
Signals, points and power7013%16% 3 a day, more than 1 of the other 4 years1
Weather and structures7714%7% 3 a day, more than 3 of the other 4 years-
Autumn438%7% 2 a day, more than 3 of the other 4 years-
External163%4% 1 a day, more than 1 of the other 4 years-
Network management418%17% 1 a day, more than 1 of the other 4 years4
The operators' causes
Train faults7414%16% 3 a day, more than 1 of the other 4 years-
Traincrew407%11% 1 a day, more than 2 of the other 4 years-
Stations122%3% 0 a day, more than 1 of the other 4 years-
Operations255%5% 1 a day, more than 1 of the other 4 years-
Operator, other9518%7% 3 a day, the most in 5 years1

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions55
MPRail / wheel interface, adhesion problems (including ice on the running rail)44
Q3NZ Pumps T43
TGDriver35
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure30
IRBroken/cracked/twisted/buckled/flawed rail27
MCDiesel Loco failure, defect, attention23
VWSevere weather affecting passenger Fleet equipment including follwogin company standards/policies or Rule book instructions22
JKFlooding not due to exceptional weather15
I2AC/DC trip (including no fault or cause found)14
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver2,377
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)2,055
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions1,957
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,451
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure1,182
IBPoints failure (including no fault found)1,178
M8Technical failures above the Solebar1,085
M7Door and Door system faults951
MDTechnical failures below the solebar935
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure764