Leaves on the Line

Falkirk High

FKK Scotland route
CSV JSON

123 delay minutes

The biggest share (39%) of the delay picked up at Falkirk High in the four weeks to 9 December 2023 came from faulty trains.

79% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track65%8% 0 a day, the least in 5 years-
Signals, points and power1512%16% 1 a day, more than 1 of the other 4 years-
Weather and structures1210%7% 0 a day, the most in 5 years-
Autumn76%7% 0 a day, more than 3 of the other 4 years-
External32%4% 0 a day, more than 1 of the other 4 years-
Network management65%17% 0 a day, the least in 5 years-
The operators' causes
Train faults4839%16% 2 a day, more than 3 of the other 4 years-
Traincrew--11% 0 a day, the least in 5 years-
Stations1210%3% 0 a day, more than 1 of the other 4 years-
Operations76%5% 0 a day, more than 3 of the other 4 years-
Operator, other76%7% 0 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar29
M8Technical failures above the Solebar12
RQUn-booked assistance for a person with reduced mobility joining/alighting,10
MCDiesel Loco failure, defect, attention7
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)7
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions7
JKFlooding not due to exceptional weather5
IASignal failure (including no fault found)4
ICTrack circuit failure (including no fault found)4
IISignalling lineside cable fault4
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.581
IBPoints failure (including no fault found)547
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions517
ICTrack circuit failure (including no fault found)496
TGDriver488
M7Door and Door system faults436
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)432
RQUn-booked assistance for a person with reduced mobility joining/alighting,275
M8Technical failures above the Solebar269
JKFlooding not due to exceptional weather262