2,090 delay minutes
The biggest share (26%) of the delay picked up at Finsbury Park in the four weeks to 9 December 2023 came from how the network was run.
71% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 123 | 6% | 8% | 4 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 200 | 10% | 16% | 7 a day, the least in 5 years | - |
| Weather and structures | 98 | 5% | 7% | 4 a day, more than 3 of the other 4 years | 1 |
| Autumn | 60 | 3% | 7% | 2 a day, more than 2 of the other 4 years | - |
| External | 67 | 3% | 4% | 2 a day, more than 2 of the other 4 years | - |
| Network management | 554 | 26% | 17% | 20 a day, more than 2 of the other 4 years | 3 |
| The operators' causes | |||||
| Train faults | 207 | 10% | 16% | 7 a day, more than 1 of the other 4 years | 6 |
| Traincrew | 522 | 25% | 11% | 19 a day, more than 1 of the other 4 years | 13 |
| Stations | 60 | 3% | 3% | 2 a day, more than 1 of the other 4 years | - |
| Operations | 121 | 6% | 5% | 4 a day, more than 2 of the other 4 years | - |
| Operator, other | 79 | 4% | 7% | 3 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 399 |
| TI | Traincrew rostering problem | 114 |
| OU | Delays not Investigated by Network Rail | 103 |
| OK | Delay caused by Operating staff oversight, issues or absence (excluding signallers and Control) | 87 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 82 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 79 |
| TA | Train-crew/loco/stock/unit diagram issues | 54 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 53 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 49 |
| IE | Signalling Functional Power Supply Failure | 45 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 36,331 |
| TI | Traincrew rostering problem | 15,620 |
| I1 | Overhead line/third rail defect | 8,904 |
| M8 | Technical failures above the Solebar | 8,448 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 8,372 |
| IB | Points failure (including no fault found) | 5,659 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 5,166 |
| MD | Technical failures below the solebar | 5,128 |
| IC | Track circuit failure (including no fault found) | 5,040 |
| IA | Signal failure (including no fault found) | 4,655 |