Finsbury Park

FPK East Coast route
CSV JSON

2,090 delay minutes

The biggest share (26%) of the delay picked up at Finsbury Park in the four weeks to 9 December 2023 came from how the network was run.

71% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1236%8% 4 a day, more than 1 of the other 4 years-
Signals, points and power20010%16% 7 a day, the least in 5 years-
Weather and structures985%7% 4 a day, more than 3 of the other 4 years1
Autumn603%7% 2 a day, more than 2 of the other 4 years-
External673%4% 2 a day, more than 2 of the other 4 years-
Network management55426%17% 20 a day, more than 2 of the other 4 years3
The operators' causes
Train faults20710%16% 7 a day, more than 1 of the other 4 years6
Traincrew52225%11% 19 a day, more than 1 of the other 4 years13
Stations603%3% 2 a day, more than 1 of the other 4 years-
Operations1216%5% 4 a day, more than 2 of the other 4 years-
Operator, other794%7% 3 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver399
TITraincrew rostering problem114
OUDelays not Investigated by Network Rail103
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)87
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.82
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)79
TATrain-crew/loco/stock/unit diagram issues54
OCSignaller including mis-routing (not ERTM /ETCS related)53
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail49
IESignalling Functional Power Supply Failure45
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver36,331
TITraincrew rostering problem15,620
I1Overhead line/third rail defect8,904
M8Technical failures above the Solebar8,448
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.8,372
IBPoints failure (including no fault found)5,659
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure5,166
MDTechnical failures below the solebar5,128
ICTrack circuit failure (including no fault found)5,040
IASignal failure (including no fault found)4,655