Leaves on the Line

Fearn

FRN Scotland route
CSV JSON

12 delay minutes

The biggest share (50%) of the delay picked up at Fearn in the four weeks to 9 December 2023 came from weather and structures.

0% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track217%8%-
Signals, points and power--16%-
Weather and structures650%7%-
Autumn--7%-
External--4%-
Network management217%17%-
The operators' causes
Train faults--16%-
Traincrew217%11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)6
IRBroken/cracked/twisted/buckled/flawed rail2
Q1Takeback Pumps2
TGDriver2
Since 2018
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)124
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions106
ZUNo Cause Identified After investigation by both Parties95
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)68
MDTechnical failures below the solebar57
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards43
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail33
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure18
IRBroken/cracked/twisted/buckled/flawed rail16
I0Telecom equipment legacy radio failures (RETB)15