Leaves on the Line

Fort William

FTW Scotland route
CSV JSON

241 delay minutes

The biggest share (29%) of the delay picked up at Fort William in the four weeks to 9 December 2023 came from weather and structures.

45% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track62%8% 0 a day, the most in 5 years-
Signals, points and power3615%16% 1 a day, more than 2 of the other 4 years-
Weather and structures6929%7% 2 a day, the most in 5 years-
Autumn73%7% 0 a day, more than 3 of the other 4 years-
External187%4% 1 a day, the most in 5 years-
Network management4017%17% 1 a day, the most in 5 years3
The operators' causes
Train faults3012%16% 1 a day, more than 1 of the other 4 years1
Traincrew2510%11% 1 a day, more than 3 of the other 4 years-
Stations31%3% 0 a day, more than 3 of the other 4 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other73%7% 0 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions49
IASignal failure (including no fault found)28
TGDriver25
ZUNo Cause Identified After investigation by both Parties21
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)18
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)18
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards12
MLWagons, coaches and parcel vehicle faults12
M8Technical failures above the Solebar11
IBPoints failure (including no fault found)8
Since 2018
CodeWhat Network Rail loggedMinutes
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions2,046
MDTechnical failures below the solebar1,492
TGDriver1,328
ZUNo Cause Identified After investigation by both Parties940
M8Technical failures above the Solebar837
RBPassengers joining/alighting549
IBPoints failure (including no fault found)526
M0Confirmed train cab based safety system fault (including GSMR)478
MNBrake and brake systems faults; including wheel flats where no other cause had been identified456
M7Door and Door system faults244