Fort William
241 delay minutes
The biggest share (29%) of the delay picked up at Fort William in the four weeks to 9 December 2023 came from weather and structures.
45% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 6 | 2% | 8% | 0 a day, the most in 5 years | - |
| Signals, points and power | 36 | 15% | 16% | 1 a day, more than 2 of the other 4 years | - |
| Weather and structures | 69 | 29% | 7% | 2 a day, the most in 5 years | - |
| Autumn | 7 | 3% | 7% | 0 a day, more than 3 of the other 4 years | - |
| External | 18 | 7% | 4% | 1 a day, the most in 5 years | - |
| Network management | 40 | 17% | 17% | 1 a day, the most in 5 years | 3 |
| The operators' causes | |||||
| Train faults | 30 | 12% | 16% | 1 a day, more than 1 of the other 4 years | 1 |
| Traincrew | 25 | 10% | 11% | 1 a day, more than 3 of the other 4 years | - |
| Stations | 3 | 1% | 3% | 0 a day, more than 3 of the other 4 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 7 | 3% | 7% | 0 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 49 |
| IA | Signal failure (including no fault found) | 28 |
| TG | Driver | 25 |
| ZU | No Cause Identified After investigation by both Parties | 21 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 18 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 18 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 12 |
| ML | Wagons, coaches and parcel vehicle faults | 12 |
| M8 | Technical failures above the Solebar | 11 |
| IB | Points failure (including no fault found) | 8 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 2,046 |
| MD | Technical failures below the solebar | 1,492 |
| TG | Driver | 1,328 |
| ZU | No Cause Identified After investigation by both Parties | 940 |
| M8 | Technical failures above the Solebar | 837 |
| RB | Passengers joining/alighting | 549 |
| IB | Points failure (including no fault found) | 526 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 478 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 456 |
| M7 | Door and Door system faults | 244 |