Gorebridge
0 delay minutes
No delay was picked up at Gorebridge in the four weeks to 9 December 2023.
100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Nothing logged. | ||
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 30 |
| XT | Severe snow or ice affecting infrastructure which is the responsibility of NR (including implementation of Key Route Strategy) | 21 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 10 |
| MD | Technical failures below the solebar | 8 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 6 |
| J0 | Telecom equipment radio failure (GSM-R) | 6 |
| TG | Driver | 2 |
| Q1 | Takeback Pumps | 2 |
| ZU | No Cause Identified After investigation by both Parties | 1 |