Georgemas Junction
156 delay minutes
The biggest share (33%) of the delay picked up at Georgemas Junction in the four weeks to 9 December 2023 came from weather and structures.
58% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 9 | 6% | 8% | 0 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 13 | 8% | 16% | 0 a day, more than 2 of the other 4 years | - |
| Weather and structures | 51 | 33% | 7% | 2 a day, more than 3 of the other 4 years | - |
| Autumn | 10 | 6% | 7% | 0 a day, more than 2 of the other 4 years | - |
| External | 12 | 8% | 4% | 0 a day, the least in 5 years | - |
| Network management | 26 | 17% | 17% | 1 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 16 | 10% | 16% | 1 a day, more than 1 of the other 4 years | - |
| Traincrew | 3 | 2% | 11% | 0 a day, more than 2 of the other 4 years | - |
| Stations | 3 | 2% | 3% | 0 a day, more than 3 of the other 4 years | - |
| Operations | 3 | 2% | 5% | 0 a day, more than 2 of the other 4 years | - |
| Operator, other | 10 | 6% | 7% | 0 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 40 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 14 |
| IK | Telecom equipment failure (including no fault found) | 13 |
| M8 | Technical failures above the Solebar | 12 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 12 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 10 |
| Q3 | NZ Pumps T | 10 |
| JB | Reactionary Delay to 'P' coded TSRs | 9 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 8 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 6 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZU | No Cause Identified After investigation by both Parties | 2,613 |
| MD | Technical failures below the solebar | 1,478 |
| TG | Driver | 946 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 681 |
| I0 | Telecom equipment legacy radio failures (RETB) | 459 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 431 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 405 |
| JB | Reactionary Delay to 'P' coded TSRs | 356 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 346 |
| RB | Passengers joining/alighting | 312 |