Georgemas Junction

GGJ Scotland route
CSV JSON

156 delay minutes

The biggest share (33%) of the delay picked up at Georgemas Junction in the four weeks to 9 December 2023 came from weather and structures.

58% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track96%8% 0 a day, more than 3 of the other 4 years-
Signals, points and power138%16% 0 a day, more than 2 of the other 4 years-
Weather and structures5133%7% 2 a day, more than 3 of the other 4 years-
Autumn106%7% 0 a day, more than 2 of the other 4 years-
External128%4% 0 a day, the least in 5 years-
Network management2617%17% 1 a day, more than 2 of the other 4 years-
The operators' causes
Train faults1610%16% 1 a day, more than 1 of the other 4 years-
Traincrew32%11% 0 a day, more than 2 of the other 4 years-
Stations32%3% 0 a day, more than 3 of the other 4 years-
Operations32%5% 0 a day, more than 2 of the other 4 years-
Operator, other106%7% 0 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)40
I8Animal Strike or Incursion within the control of Network Rail14
IKTelecom equipment failure (including no fault found)13
M8Technical failures above the Solebar12
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)12
MPRail / wheel interface, adhesion problems (including ice on the running rail)10
Q3NZ Pumps T10
JBReactionary Delay to 'P' coded TSRs9
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail8
OCSignaller including mis-routing (not ERTM /ETCS related)6
Since 2018
CodeWhat Network Rail loggedMinutes
ZUNo Cause Identified After investigation by both Parties2,613
MDTechnical failures below the solebar1,478
TGDriver946
IRBroken/cracked/twisted/buckled/flawed rail681
I0Telecom equipment legacy radio failures (RETB)459
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions431
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)405
JBReactionary Delay to 'P' coded TSRs356
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.346
RBPassengers joining/alighting312