Glenfinnan
156 delay minutes
The biggest share (28%) of the delay picked up at Glenfinnan in the four weeks to 9 December 2023 came from weather and structures.
28% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 37 | 24% | 8% | 1 a day, the most in 5 years | - |
| Signals, points and power | 34 | 22% | 16% | 1 a day, the most in 5 years | - |
| Weather and structures | 43 | 28% | 7% | 2 a day, more than 2 of the other 4 years | - |
| Autumn | - | - | 7% | 0 a day, the least in 5 years | - |
| External | 6 | 4% | 4% | 0 a day, the most in 5 years | - |
| Network management | 18 | 12% | 17% | 1 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 6 | 4% | 16% | 0 a day, more than 3 of the other 4 years | - |
| Traincrew | 9 | 6% | 11% | 0 a day, the most in 5 years | - |
| Stations | 3 | 2% | 3% | 0 a day, the most in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | - | - | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 43 |
| IB | Points failure (including no fault found) | 26 |
| JA | TSR speed restrictions for track work outside of the Timetable Planning Rules | 23 |
| ZU | No Cause Identified After investigation by both Parties | 18 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 14 |
| IK | Telecom equipment failure (including no fault found) | 8 |
| MD | Technical failures below the solebar | 6 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 6 |
| FC | Freight Train Driver error, SPAD, Wrong routing or Missed AWS/DSD [No change] | 5 |
| TG | Driver | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 4,074 |
| ZU | No Cause Identified After investigation by both Parties | 799 |
| MD | Technical failures below the solebar | 337 |
| TG | Driver | 335 |
| M8 | Technical failures above the Solebar | 302 |
| I0 | Telecom equipment legacy radio failures (RETB) | 228 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 202 |
| RB | Passengers joining/alighting | 201 |
| IB | Points failure (including no fault found) | 200 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 189 |