Glenrothes with Thornton
263 delay minutes
The biggest share (19%) of the delay picked up at Glenrothes with Thornton in the four weeks to 9 December 2023 came from autumn leaves.
95% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 16 | 6% | 8% | 1 a day, more than 2 of the other 4 years | 2 |
| Signals, points and power | 20 | 8% | 16% | 1 a day, the least in 5 years | - |
| Weather and structures | 30 | 11% | 7% | 1 a day, more than 1 of the other 4 years | 2 |
| Autumn | 50 | 19% | 7% | 2 a day, more than 1 of the other 4 years | - |
| External | 10 | 4% | 4% | 0 a day, more than 3 of the other 4 years | 5 |
| Network management | 8 | 3% | 17% | 0 a day, the least in 5 years | 11 |
| The operators' causes | |||||
| Train faults | 19 | 7% | 16% | 1 a day, the least in 5 years | 9 |
| Traincrew | 23 | 9% | 11% | 1 a day, the least in 5 years | 2 |
| Stations | 25 | 10% | 3% | 1 a day, more than 2 of the other 4 years | - |
| Operations | 21 | 8% | 5% | 1 a day, more than 1 of the other 4 years | 1 |
| Operator, other | 42 | 16% | 7% | 1 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 33 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 30 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 26 |
| TG | Driver | 23 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 21 |
| QH | Adhesion problems due to leaf contamination | 17 |
| RB | Passengers joining/alighting | 17 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 13 |
| M8 | Technical failures above the Solebar | 10 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 10 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 2,036 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 1,725 |
| MD | Technical failures below the solebar | 1,537 |
| M8 | Technical failures above the Solebar | 1,242 |
| IC | Track circuit failure (including no fault found) | 1,113 |
| Q3 | NZ Pumps T | 893 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 726 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 718 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 671 |
| ZU | No Cause Identified After investigation by both Parties | 632 |