1,424 delay minutes

The biggest share (32%) of the delay picked up at Gobowen in the four weeks to 9 December 2023 came from faulty trains.

54% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power18113%16% 6 a day, the most in 5 years-
Weather and structures3<1%7% 0 a day, the least in 5 years-
Autumn20414%7% 7 a day, the most in 5 years-
External1057%4% 4 a day, the most in 5 years-
Network management524%17% 2 a day, the least in 5 years-
The operators' causes
Train faults46232%16% 17 a day, the most in 5 years-
Traincrew13910%11% 5 a day, the most in 5 years-
Stations514%3% 2 a day, the most in 5 years-
Operations13710%5% 5 a day, the most in 5 years-
Operator, other906%7% 3 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TZOther Passenger Train Operating Company causes134
M9Reported fleet equipment defect - no fault found128
IJAWS/ATP/TPWS/Train stop/On track equipment failure121
QICautioning due to railhead leaf contamination121
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)92
M7Door and Door system faults85
TGDriver84
Q3NZ Pumps T83
TTLeaf fall Neutral83
M8Technical failures above the Solebar81
Since 2018
CodeWhat Network Rail loggedMinutes
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps2,028
TGDriver1,937
MDTechnical failures below the solebar1,429
M8Technical failures above the Solebar1,340
TZOther Passenger Train Operating Company causes1,172
OUDelays not Investigated by Network Rail1,123
J3Axle Counter Failure1,107
T2Delay at unstaffed station to non-DOO train1,053
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail796
TH(Senior) Conductor/Train Manager729