Glasgow Queen Street Low Level
967 delay minutes
The biggest share (18%) of the delay picked up at Glasgow Queen Street Low Level in the four weeks to 9 December 2023 came from other operator causes.
95% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 106 | 11% | 8% | 4 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 26 | 3% | 16% | 1 a day, the least in 5 years | 2 |
| Weather and structures | 19 | 2% | 7% | 1 a day, more than 1 of the other 4 years | - |
| Autumn | 175 | 18% | 7% | 6 a day, more than 3 of the other 4 years | - |
| External | 15 | 2% | 4% | 1 a day, more than 1 of the other 4 years | - |
| Network management | 129 | 13% | 17% | 5 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 143 | 15% | 16% | 5 a day, more than 2 of the other 4 years | - |
| Traincrew | 116 | 12% | 11% | 4 a day, more than 2 of the other 4 years | - |
| Stations | 19 | 2% | 3% | 1 a day, more than 1 of the other 4 years | - |
| Operations | 44 | 5% | 5% | 2 a day, more than 1 of the other 4 years | - |
| Operator, other | 177 | 18% | 7% | 6 a day, more than 2 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 137 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 114 |
| TG | Driver | 104 |
| JB | Reactionary Delay to 'P' coded TSRs | 79 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 59 |
| M8 | Technical failures above the Solebar | 59 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 31 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 27 |
| OE | Failure to lay Sandite or operate Railhead Conditioning train as programmed | 25 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 25 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 7,563 |
| TG | Driver | 4,147 |
| M8 | Technical failures above the Solebar | 3,073 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,295 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 2,271 |
| IB | Points failure (including no fault found) | 2,152 |
| Q3 | NZ Pumps T | 2,142 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 1,751 |
| M7 | Door and Door system faults | 1,662 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,630 |