2,181 delay minutes

The biggest share (43%) of the delay picked up at Grantham in the four weeks to 9 December 2023 came from signal, points and power faults.

40% of these minutes were knock-on from something that happened elsewhere first. 81% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track663%8% 2 a day, the least in 5 years1
Signals, points and power93643%16% 33 a day, the most in 5 years1
Weather and structures1065%7% 4 a day, the most in 5 years-
Autumn1698%7% 6 a day, the most in 5 years-
External763%4% 3 a day, more than 1 of the other 4 years-
Network management45821%17% 16 a day, more than 3 of the other 4 years-
The operators' causes
Train faults22410%16% 8 a day, more than 3 of the other 4 years2
Traincrew311%11% 1 a day, more than 1 of the other 4 years1
Stations462%3% 2 a day, more than 2 of the other 4 years-
Operations261%5% 1 a day, more than 3 of the other 4 years-
Operator, other442%7% 2 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)299
I1Overhead line/third rail defect272
I8Animal Strike or Incursion within the control of Network Rail272
QJSpecial working for leaf-fall track circuit operation133
I2AC/DC trip (including no fault or cause found)109
IESignalling Functional Power Supply Failure103
IASignal failure (including no fault found)92
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)70
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail58
OUDelays not Investigated by Network Rail57
Since 2018
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar5,394
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.4,938
IBPoints failure (including no fault found)3,852
I1Overhead line/third rail defect3,410
JSCondition of Track TSR outside the Timetable Planning Rules3,140
M8Technical failures above the Solebar3,089
MNBrake and brake systems faults; including wheel flats where no other cause had been identified2,682
IISignalling lineside cable fault2,591
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail2,465
TGDriver2,396