Grantham
2,181 delay minutes
The biggest share (43%) of the delay picked up at Grantham in the four weeks to 9 December 2023 came from signal, points and power faults.
40% of these minutes were knock-on from something that happened elsewhere first. 81% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 66 | 3% | 8% | 2 a day, the least in 5 years | 1 |
| Signals, points and power | 936 | 43% | 16% | 33 a day, the most in 5 years | 1 |
| Weather and structures | 106 | 5% | 7% | 4 a day, the most in 5 years | - |
| Autumn | 169 | 8% | 7% | 6 a day, the most in 5 years | - |
| External | 76 | 3% | 4% | 3 a day, more than 1 of the other 4 years | - |
| Network management | 458 | 21% | 17% | 16 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 224 | 10% | 16% | 8 a day, more than 3 of the other 4 years | 2 |
| Traincrew | 31 | 1% | 11% | 1 a day, more than 1 of the other 4 years | 1 |
| Stations | 46 | 2% | 3% | 2 a day, more than 2 of the other 4 years | - |
| Operations | 26 | 1% | 5% | 1 a day, more than 3 of the other 4 years | - |
| Operator, other | 44 | 2% | 7% | 2 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 299 |
| I1 | Overhead line/third rail defect | 272 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 272 |
| QJ | Special working for leaf-fall track circuit operation | 133 |
| I2 | AC/DC trip (including no fault or cause found) | 109 |
| IE | Signalling Functional Power Supply Failure | 103 |
| IA | Signal failure (including no fault found) | 92 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 70 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 58 |
| OU | Delays not Investigated by Network Rail | 57 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 5,394 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 4,938 |
| IB | Points failure (including no fault found) | 3,852 |
| I1 | Overhead line/third rail defect | 3,410 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 3,140 |
| M8 | Technical failures above the Solebar | 3,089 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 2,682 |
| II | Signalling lineside cable fault | 2,591 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 2,465 |
| TG | Driver | 2,396 |