1,345 delay minutes

The biggest share (22%) of the delay picked up at Garscadden in the four weeks to 9 December 2023 came from other operator causes.

94% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track615%8% 2 a day, the least in 5 years-
Signals, points and power987%16% 4 a day, the least in 5 years8
Weather and structures322%7% 1 a day, more than 1 of the other 4 years1
Autumn24018%7% 9 a day, the least in 5 years-
External312%4% 1 a day, more than 2 of the other 4 years-
Network management14010%17% 5 a day, more than 1 of the other 4 years1
The operators' causes
Train faults20615%16% 7 a day, more than 2 of the other 4 years3
Traincrew17213%11% 6 a day, more than 2 of the other 4 years1
Stations161%3% 1 a day, more than 1 of the other 4 years-
Operations514%5% 2 a day, more than 2 of the other 4 years1
Operator, other29922%7% 11 a day, more than 2 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T183
MPRail / wheel interface, adhesion problems (including ice on the running rail)163
TGDriver162
M8Technical failures above the Solebar107
VWSevere weather affecting passenger Fleet equipment including follwogin company standards/policies or Rule book instructions81
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)59
OEFailure to lay Sandite or operate Railhead Conditioning train as programmed52
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure45
I1Overhead line/third rail defect43
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.37
Since 2018
CodeWhat Network Rail loggedMinutes
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)9,773
TGDriver7,961
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)4,748
M8Technical failures above the Solebar4,171
Q3NZ Pumps T2,943
MPRail / wheel interface, adhesion problems (including ice on the running rail)2,934
JBReactionary Delay to 'P' coded TSRs2,897
M7Door and Door system faults2,150
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,116
IBPoints failure (including no fault found)2,018