Leaves on the Line

Gatwick Airport

GTW Sussex route
CSV JSON

4,181 delay minutes

The biggest share (26%) of the delay picked up at Gatwick Airport in the four weeks to 9 December 2023 came from how the network was run.

66% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track93522%8% 33 a day, the most in 5 years5
Signals, points and power82120%16% 29 a day, more than 1 of the other 4 years10
Weather and structures2306%7% 8 a day, more than 3 of the other 4 years15
Autumn35<1%7% 1 a day, the least in 5 years-
External1945%4% 7 a day, more than 3 of the other 4 years5
Network management1,10226%17% 39 a day, the least in 5 years16
The operators' causes
Train faults1774%16% 6 a day, more than 1 of the other 4 years77
Traincrew3739%11% 13 a day, more than 1 of the other 4 years22
Stations1173%3% 4 a day, more than 3 of the other 4 years2
Operations932%5% 3 a day, more than 2 of the other 4 years2
Operator, other1042%7% 4 a day, the least in 5 years1

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IRBroken/cracked/twisted/buckled/flawed rail786
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)483
IBPoints failure (including no fault found)452
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)225
TGDriver220
OCSignaller including mis-routing (not ERTM /ETCS related)202
XBVandalism or theft (including the placing of objects on the line)148
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.130
TITraincrew rostering problem120
IQTrackside sign blown down, fallen over, missing, defective, mis-placed101
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)21,505
OCSignaller including mis-routing (not ERTM /ETCS related)21,310
TGDriver19,339
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.16,801
ICTrack circuit failure (including no fault found)14,282
IRBroken/cracked/twisted/buckled/flawed rail11,080
OBDelayed by signaller not applying applicable regulating policy11,031
IBPoints failure (including no fault found)10,386
M8Technical failures above the Solebar9,314
TITraincrew rostering problem7,579