Hereford
1,013 delay minutes
The biggest share (27%) of the delay picked up at Hereford in the four weeks to 9 December 2023 came from faulty trains.
68% of these minutes were knock-on from something that happened elsewhere first. 86% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 61 | 6% | 8% | 2 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 108 | 11% | 16% | 4 a day, the most in 5 years | 9 |
| Weather and structures | 109 | 11% | 7% | 4 a day, the most in 5 years | - |
| Autumn | 10 | <1% | 7% | 0 a day, the least in 5 years | - |
| External | 10 | <1% | 4% | 0 a day, more than 1 of the other 4 years | - |
| Network management | 128 | 13% | 17% | 5 a day, the least in 5 years | 54 |
| The operators' causes | |||||
| Train faults | 276 | 27% | 16% | 10 a day, more than 2 of the other 4 years | 2 |
| Traincrew | 151 | 15% | 11% | 5 a day, the most in 5 years | 29 |
| Stations | 76 | 8% | 3% | 3 a day, the most in 5 years | - |
| Operations | 48 | 5% | 5% | 2 a day, more than 2 of the other 4 years | 1 |
| Operator, other | 36 | 4% | 7% | 1 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M8 | Technical failures above the Solebar | 165 |
| TG | Driver | 93 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 69 |
| IB | Points failure (including no fault found) | 67 |
| TH | (Senior) Conductor/Train Manager | 51 |
| TZ | Other Passenger Train Operating Company causes | 48 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 40 |
| MD | Technical failures below the solebar | 31 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 29 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 28 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 3,167 |
| TG | Driver | 2,588 |
| M8 | Technical failures above the Solebar | 1,971 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 1,874 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,527 |
| IB | Points failure (including no fault found) | 1,467 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,393 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 1,223 |
| TH | (Senior) Conductor/Train Manager | 1,194 |
| OL | Signal Box not open during booked hours | 1,166 |