419 delay minutes

The biggest share (33%) of the delay picked up at Hertford North in the four weeks to 9 December 2023 came from faulty trains.

33% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track3<1%8% 0 a day, the least in 5 years-
Signals, points and power6415%16% 2 a day, more than 2 of the other 4 years2
Weather and structures--7% 0 a day, the least in 5 years-
Autumn113%7% 0 a day, more than 2 of the other 4 years-
External61%4% 0 a day, more than 1 of the other 4 years1
Network management5012%17% 2 a day, more than 1 of the other 4 years11
The operators' causes
Train faults13733%16% 5 a day, more than 3 of the other 4 years4
Traincrew11227%11% 4 a day, more than 2 of the other 4 years2
Stations--3% 0 a day, the least in 5 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other369%7% 1 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar129
TGDriver55
IBPoints failure (including no fault found)46
T3Waiting connections from other transport modes38
QBPlanned engineering work - diversion/SLW not timetabled (outside the Timetable Planning Rules)23
VBVandalism or theft23
TITraincrew rostering problem16
IASignal failure (including no fault found)8
MUDepot operating problem8
Q3NZ Pumps T8
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver6,227
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.3,735
JSCondition of Track TSR outside the Timetable Planning Rules3,231
TITraincrew rostering problem2,271
MDTechnical failures below the solebar1,580
M8Technical failures above the Solebar1,331
I1Overhead line/third rail defect1,147
OCSignaller including mis-routing (not ERTM /ETCS related)1,048
IBPoints failure (including no fault found)996
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure929