Hertford North
419 delay minutes
The biggest share (33%) of the delay picked up at Hertford North in the four weeks to 9 December 2023 came from faulty trains.
33% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 3 | <1% | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 64 | 15% | 16% | 2 a day, more than 2 of the other 4 years | 2 |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 11 | 3% | 7% | 0 a day, more than 2 of the other 4 years | - |
| External | 6 | 1% | 4% | 0 a day, more than 1 of the other 4 years | 1 |
| Network management | 50 | 12% | 17% | 2 a day, more than 1 of the other 4 years | 11 |
| The operators' causes | |||||
| Train faults | 137 | 33% | 16% | 5 a day, more than 3 of the other 4 years | 4 |
| Traincrew | 112 | 27% | 11% | 4 a day, more than 2 of the other 4 years | 2 |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 36 | 9% | 7% | 1 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 129 |
| TG | Driver | 55 |
| IB | Points failure (including no fault found) | 46 |
| T3 | Waiting connections from other transport modes | 38 |
| QB | Planned engineering work - diversion/SLW not timetabled (outside the Timetable Planning Rules) | 23 |
| VB | Vandalism or theft | 23 |
| TI | Traincrew rostering problem | 16 |
| IA | Signal failure (including no fault found) | 8 |
| MU | Depot operating problem | 8 |
| Q3 | NZ Pumps T | 8 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 6,227 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 3,735 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 3,231 |
| TI | Traincrew rostering problem | 2,271 |
| MD | Technical failures below the solebar | 1,580 |
| M8 | Technical failures above the Solebar | 1,331 |
| I1 | Overhead line/third rail defect | 1,147 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,048 |
| IB | Points failure (including no fault found) | 996 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 929 |