Holyhead
2,543 delay minutes
The biggest share (37%) of the delay picked up at Holyhead in the four weeks to 9 December 2023 came from faulty trains.
67% of these minutes were knock-on from something that happened elsewhere first. 80% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 22 | <1% | 8% | 1 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 317 | 12% | 16% | 11 a day, the most in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 121 | 5% | 7% | 4 a day, the most in 5 years | - |
| External | 33 | 1% | 4% | 1 a day, more than 2 of the other 4 years | - |
| Network management | 650 | 26% | 17% | 23 a day, the most in 5 years | 2 |
| The operators' causes | |||||
| Train faults | 953 | 37% | 16% | 34 a day, the most in 5 years | 1 |
| Traincrew | 251 | 10% | 11% | 9 a day, more than 3 of the other 4 years | 3 |
| Stations | 47 | 2% | 3% | 2 a day, more than 2 of the other 4 years | - |
| Operations | 79 | 3% | 5% | 3 a day, more than 2 of the other 4 years | - |
| Operator, other | 70 | 3% | 7% | 3 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 447 |
| M8 | Technical failures above the Solebar | 412 |
| M9 | Reported fleet equipment defect - no fault found | 181 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 174 |
| TG | Driver | 162 |
| IJ | AWS/ATP/TPWS/Train stop/On track equipment failure | 89 |
| TZ | Other Passenger Train Operating Company causes | 79 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 72 |
| Q3 | NZ Pumps T | 70 |
| TT | Leaf fall Neutral | 68 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 5,969 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 4,348 |
| M8 | Technical failures above the Solebar | 4,121 |
| MD | Technical failures below the solebar | 3,888 |
| T2 | Delay at unstaffed station to non-DOO train | 2,894 |
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 2,354 |
| TH | (Senior) Conductor/Train Manager | 2,268 |
| M9 | Reported fleet equipment defect - no fault found | 2,143 |
| TZ | Other Passenger Train Operating Company causes | 1,909 |
| OU | Delays not Investigated by Network Rail | 1,905 |