Leaves on the Line

Holyhead

HHD Wales route
CSV JSON

2,543 delay minutes

The biggest share (37%) of the delay picked up at Holyhead in the four weeks to 9 December 2023 came from faulty trains.

67% of these minutes were knock-on from something that happened elsewhere first. 80% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track22<1%8% 1 a day, more than 2 of the other 4 years-
Signals, points and power31712%16% 11 a day, the most in 5 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn1215%7% 4 a day, the most in 5 years-
External331%4% 1 a day, more than 2 of the other 4 years-
Network management65026%17% 23 a day, the most in 5 years2
The operators' causes
Train faults95337%16% 34 a day, the most in 5 years1
Traincrew25110%11% 9 a day, more than 3 of the other 4 years3
Stations472%3% 2 a day, more than 2 of the other 4 years-
Operations793%5% 3 a day, more than 2 of the other 4 years-
Operator, other703%7% 3 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)447
M8Technical failures above the Solebar412
M9Reported fleet equipment defect - no fault found181
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps174
TGDriver162
IJAWS/ATP/TPWS/Train stop/On track equipment failure89
TZOther Passenger Train Operating Company causes79
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)72
Q3NZ Pumps T70
TTLeaf fall Neutral68
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver5,969
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps4,348
M8Technical failures above the Solebar4,121
MDTechnical failures below the solebar3,888
T2Delay at unstaffed station to non-DOO train2,894
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)2,354
TH(Senior) Conductor/Train Manager2,268
M9Reported fleet equipment defect - no fault found2,143
TZOther Passenger Train Operating Company causes1,909
OUDelays not Investigated by Network Rail1,905