Leaves on the Line

Haywards Heath

HHE Sussex route
CSV JSON

2,436 delay minutes

The biggest share (28%) of the delay picked up at Haywards Heath in the four weeks to 9 December 2023 came from weather and structures.

58% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1406%8% 5 a day, more than 2 of the other 4 years4
Signals, points and power32413%16% 12 a day, more than 1 of the other 4 years10
Weather and structures69128%7% 25 a day, more than 3 of the other 4 years8
Autumn4<1%7% 0 a day, the least in 5 years-
External1958%4% 7 a day, the most in 5 years4
Network management60425%17% 22 a day, more than 1 of the other 4 years10
The operators' causes
Train faults1506%16% 5 a day, more than 1 of the other 4 years-
Traincrew1968%11% 7 a day, the least in 5 years3
Stations321%3% 1 a day, more than 1 of the other 4 years-
Operations301%5% 1 a day, the least in 5 years3
Operator, other713%7% 3 a day, the least in 5 years2

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)650
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)235
XBVandalism or theft (including the placing of objects on the line)154
TGDriver142
IBPoints failure (including no fault found)114
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.89
I1Overhead line/third rail defect83
M8Technical failures above the Solebar81
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)78
OBDelayed by signaller not applying applicable regulating policy78
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)17,813
TGDriver15,686
ICTrack circuit failure (including no fault found)11,243
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure9,761
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.9,520
OCSignaller including mis-routing (not ERTM /ETCS related)9,312
M8Technical failures above the Solebar6,926
OBDelayed by signaller not applying applicable regulating policy6,260
IRBroken/cracked/twisted/buckled/flawed rail5,805
TITraincrew rostering problem5,096