Leaves on the Line

Hitchin

HIT East Coast route
CSV JSON

1,421 delay minutes

The biggest share (26%) of the delay picked up at Hitchin in the four weeks to 9 December 2023 came from how the network was run.

76% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1208%8% 4 a day, more than 1 of the other 4 years-
Signals, points and power21715%16% 8 a day, more than 3 of the other 4 years-
Weather and structures967%7% 3 a day, more than 3 of the other 4 years-
Autumn634%7% 2 a day, more than 3 of the other 4 years-
External645%4% 2 a day, more than 2 of the other 4 years-
Network management37026%17% 13 a day, more than 3 of the other 4 years-
The operators' causes
Train faults14910%16% 5 a day, the least in 5 years1
Traincrew20114%11% 7 a day, the most in 5 years1
Stations413%3% 1 a day, more than 3 of the other 4 years-
Operations302%5% 1 a day, more than 1 of the other 4 years-
Operator, other715%7% 3 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver151
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.87
OUDelays not Investigated by Network Rail63
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)61
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)57
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure47
I1Overhead line/third rail defect44
OCSignaller including mis-routing (not ERTM /ETCS related)42
QJSpecial working for leaf-fall track circuit operation41
IESignalling Functional Power Supply Failure40
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver8,593
I1Overhead line/third rail defect6,106
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.4,874
M8Technical failures above the Solebar4,083
TITraincrew rostering problem3,361
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)2,967
IBPoints failure (including no fault found)2,945
MNBrake and brake systems faults; including wheel flats where no other cause had been identified2,692
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2,648
IASignal failure (including no fault found)2,495