Hitchin
1,421 delay minutes
The biggest share (26%) of the delay picked up at Hitchin in the four weeks to 9 December 2023 came from how the network was run.
76% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 120 | 8% | 8% | 4 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 217 | 15% | 16% | 8 a day, more than 3 of the other 4 years | - |
| Weather and structures | 96 | 7% | 7% | 3 a day, more than 3 of the other 4 years | - |
| Autumn | 63 | 4% | 7% | 2 a day, more than 3 of the other 4 years | - |
| External | 64 | 5% | 4% | 2 a day, more than 2 of the other 4 years | - |
| Network management | 370 | 26% | 17% | 13 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 149 | 10% | 16% | 5 a day, the least in 5 years | 1 |
| Traincrew | 201 | 14% | 11% | 7 a day, the most in 5 years | 1 |
| Stations | 41 | 3% | 3% | 1 a day, more than 3 of the other 4 years | - |
| Operations | 30 | 2% | 5% | 1 a day, more than 1 of the other 4 years | - |
| Operator, other | 71 | 5% | 7% | 3 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 151 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 87 |
| OU | Delays not Investigated by Network Rail | 63 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 61 |
| OK | Delay caused by Operating staff oversight, issues or absence (excluding signallers and Control) | 57 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 47 |
| I1 | Overhead line/third rail defect | 44 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 42 |
| QJ | Special working for leaf-fall track circuit operation | 41 |
| IE | Signalling Functional Power Supply Failure | 40 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 8,593 |
| I1 | Overhead line/third rail defect | 6,106 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 4,874 |
| M8 | Technical failures above the Solebar | 4,083 |
| TI | Traincrew rostering problem | 3,361 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 2,967 |
| IB | Points failure (including no fault found) | 2,945 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 2,692 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,648 |
| IA | Signal failure (including no fault found) | 2,495 |