380 delay minutes

The biggest share (20%) of the delay picked up at Helensburgh Central in the four weeks to 9 December 2023 came from other operator causes.

94% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track205%8% 1 a day, more than 1 of the other 4 years-
Signals, points and power246%16% 1 a day, the least in 5 years7
Weather and structures62%7% 0 a day, the least in 5 years-
Autumn6818%7% 2 a day, more than 2 of the other 4 years-
External226%4% 1 a day, more than 1 of the other 4 years-
Network management5214%17% 2 a day, more than 1 of the other 4 years-
The operators' causes
Train faults4913%16% 2 a day, more than 1 of the other 4 years2
Traincrew4813%11% 2 a day, more than 3 of the other 4 years-
Stations51%3% 0 a day, more than 3 of the other 4 years-
Operations113%5% 0 a day, more than 2 of the other 4 years-
Operator, other7620%7% 3 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T53
MPRail / wheel interface, adhesion problems (including ice on the running rail)47
TGDriver39
MNBrake and brake systems faults; including wheel flats where no other cause had been identified24
M8Technical failures above the Solebar18
JBReactionary Delay to 'P' coded TSRs16
VHPassenger Communication cord, door egress or emergency train alarm operated16
J3Axle Counter Failure11
OEFailure to lay Sandite or operate Railhead Conditioning train as programmed11
Q1Takeback Pumps10
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver1,954
M8Technical failures above the Solebar1,487
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure1,237
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)1,200
IBPoints failure (including no fault found)734
MDTechnical failures below the solebar699
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions697
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)677
MPRail / wheel interface, adhesion problems (including ice on the running rail)630
ICTrack circuit failure (including no fault found)611