Helensburgh Central
380 delay minutes
The biggest share (20%) of the delay picked up at Helensburgh Central in the four weeks to 9 December 2023 came from other operator causes.
94% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 20 | 5% | 8% | 1 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 24 | 6% | 16% | 1 a day, the least in 5 years | 7 |
| Weather and structures | 6 | 2% | 7% | 0 a day, the least in 5 years | - |
| Autumn | 68 | 18% | 7% | 2 a day, more than 2 of the other 4 years | - |
| External | 22 | 6% | 4% | 1 a day, more than 1 of the other 4 years | - |
| Network management | 52 | 14% | 17% | 2 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 49 | 13% | 16% | 2 a day, more than 1 of the other 4 years | 2 |
| Traincrew | 48 | 13% | 11% | 2 a day, more than 3 of the other 4 years | - |
| Stations | 5 | 1% | 3% | 0 a day, more than 3 of the other 4 years | - |
| Operations | 11 | 3% | 5% | 0 a day, more than 2 of the other 4 years | - |
| Operator, other | 76 | 20% | 7% | 3 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 53 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 47 |
| TG | Driver | 39 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 24 |
| M8 | Technical failures above the Solebar | 18 |
| JB | Reactionary Delay to 'P' coded TSRs | 16 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 16 |
| J3 | Axle Counter Failure | 11 |
| OE | Failure to lay Sandite or operate Railhead Conditioning train as programmed | 11 |
| Q1 | Takeback Pumps | 10 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 1,954 |
| M8 | Technical failures above the Solebar | 1,487 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 1,237 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 1,200 |
| IB | Points failure (including no fault found) | 734 |
| MD | Technical failures below the solebar | 699 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 697 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 677 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 630 |
| IC | Track circuit failure (including no fault found) | 611 |