Leaves on the Line

Helmsdale

HMS Scotland route
CSV JSON

117 delay minutes

The biggest share (43%) of the delay picked up at Helmsdale in the four weeks to 9 December 2023 came from faulty trains.

69% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power54%16% 0 a day, more than 1 of the other 4 years-
Weather and structures2622%7% 1 a day, more than 2 of the other 4 years-
Autumn22%7% 0 a day, more than 2 of the other 4 years-
External33%4% 0 a day, the least in 5 years-
Network management65%17% 0 a day, more than 1 of the other 4 years-
The operators' causes
Train faults5043%16% 2 a day, more than 3 of the other 4 years-
Traincrew1614%11% 1 a day, the most in 5 years-
Stations76%3% 0 a day, the most in 5 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other22%7% 0 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
M8Technical failures above the Solebar41
TGDriver16
X9Points failure caused by severe snow or ice where heaters are fitted and working as designed12
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)11
MDTechnical failures below the solebar9
RBPassengers joining/alighting7
ZUNo Cause Identified After investigation by both Parties6
IKTelecom equipment failure (including no fault found)5
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions3
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)3
Since 2018
CodeWhat Network Rail loggedMinutes
ZUNo Cause Identified After investigation by both Parties1,097
MDTechnical failures below the solebar989
TGDriver544
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions381
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)311
M8Technical failures above the Solebar296
X8Animal Strike or incursion not within the control of Network Rail277
I0Telecom equipment legacy radio failures (RETB)274
IRBroken/cracked/twisted/buckled/flawed rail271
QHAdhesion problems due to leaf contamination212