Helmsdale
117 delay minutes
The biggest share (43%) of the delay picked up at Helmsdale in the four weeks to 9 December 2023 came from faulty trains.
69% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 5 | 4% | 16% | 0 a day, more than 1 of the other 4 years | - |
| Weather and structures | 26 | 22% | 7% | 1 a day, more than 2 of the other 4 years | - |
| Autumn | 2 | 2% | 7% | 0 a day, more than 2 of the other 4 years | - |
| External | 3 | 3% | 4% | 0 a day, the least in 5 years | - |
| Network management | 6 | 5% | 17% | 0 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 50 | 43% | 16% | 2 a day, more than 3 of the other 4 years | - |
| Traincrew | 16 | 14% | 11% | 1 a day, the most in 5 years | - |
| Stations | 7 | 6% | 3% | 0 a day, the most in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 2 | 2% | 7% | 0 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M8 | Technical failures above the Solebar | 41 |
| TG | Driver | 16 |
| X9 | Points failure caused by severe snow or ice where heaters are fitted and working as designed | 12 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 11 |
| MD | Technical failures below the solebar | 9 |
| RB | Passengers joining/alighting | 7 |
| ZU | No Cause Identified After investigation by both Parties | 6 |
| IK | Telecom equipment failure (including no fault found) | 5 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 3 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZU | No Cause Identified After investigation by both Parties | 1,097 |
| MD | Technical failures below the solebar | 989 |
| TG | Driver | 544 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 381 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 311 |
| M8 | Technical failures above the Solebar | 296 |
| X8 | Animal Strike or incursion not within the control of Network Rail | 277 |
| I0 | Telecom equipment legacy radio failures (RETB) | 274 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 271 |
| QH | Adhesion problems due to leaf contamination | 212 |