522 delay minutes

The biggest share (22%) of the delay picked up at Hamilton Central in the four weeks to 9 December 2023 came from weather and structures.

57% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power285%16% 1 a day, more than 2 of the other 4 years-
Weather and structures11722%7% 4 a day, the most in 5 years2
Autumn8316%7% 3 a day, more than 2 of the other 4 years-
External245%4% 1 a day, the most in 5 years-
Network management163%17% 1 a day, more than 2 of the other 4 years1
The operators' causes
Train faults11322%16% 4 a day, the most in 5 years3
Traincrew214%11% 1 a day, the least in 5 years-
Stations183%3% 1 a day, more than 3 of the other 4 years-
Operations296%5% 1 a day, more than 3 of the other 4 years-
Operator, other7314%7% 3 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
X9Points failure caused by severe snow or ice where heaters are fitted and working as designed102
Q3NZ Pumps T64
M8Technical failures above the Solebar52
MPRail / wheel interface, adhesion problems (including ice on the running rail)47
M7Door and Door system faults29
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)26
XEGSM-R call raised outside Network Rail network (by a non-track access party and/or for a legitimate safety issue)24
TTLeaf fall Neutral17
RQUn-booked assistance for a person with reduced mobility joining/alighting,14
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure13
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver1,655
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)1,609
M8Technical failures above the Solebar819
IBPoints failure (including no fault found)817
MPRail / wheel interface, adhesion problems (including ice on the running rail)816
Q3NZ Pumps T709
M7Door and Door system faults680
MNBrake and brake systems faults; including wheel flats where no other cause had been identified516
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)510
QICautioning due to railhead leaf contamination438