Leaves on the Line

Harrow-on-the-Hill

HOH Chiltern route
CSV JSON

2,046 delay minutes

Most of the delay picked up at Harrow-on-the-Hill in the four weeks to 9 December 2023 came from the operators' own operations.

2% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power17<1%16% 1 a day, the least in 5 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn955%7% 3 a day, the most in 5 years-
External9<1%4% 0 a day, more than 3 of the other 4 years-
Network management20<1%17% 1 a day, the least in 5 years-
The operators' causes
Train faults1075%16% 4 a day, more than 2 of the other 4 years1
Traincrew884%11% 3 a day, more than 3 of the other 4 years-
Stations7<1%3% 0 a day, the least in 5 years-
Operations1,67682%5% 60 a day, more than 3 of the other 4 years-
Operator, other271%7% 1 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TXDelays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays)1,671
TGDriver86
QJSpecial working for leaf-fall track circuit operation58
M7Door and Door system faults44
OEFailure to lay Sandite or operate Railhead Conditioning train as programmed26
MDTechnical failures below the solebar21
VXExternal events occurring on the LUL or other non NR running lines19
M8Technical failures above the Solebar18
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident12
QICautioning due to railhead leaf contamination11
Since 2018
CodeWhat Network Rail loggedMinutes
TXDelays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays)56,653
TGDriver2,105
MDTechnical failures below the solebar1,683
VXExternal events occurring on the LUL or other non NR running lines1,647
RBPassengers joining/alighting1,159
ICTrack circuit failure (including no fault found)1,058
M8Technical failures above the Solebar698
M7Door and Door system faults636
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.558
IBPoints failure (including no fault found)425