Leaves on the Line

Hove

HOV Sussex route
CSV JSON

563 delay minutes

The biggest share (37%) of the delay picked up at Hove in the four weeks to 9 December 2023 came from how the network was run.

70% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track163%8% 1 a day, more than 1 of the other 4 years-
Signals, points and power7613%16% 3 a day, more than 1 of the other 4 years2
Weather and structures265%7% 1 a day, the most in 5 years-
Autumn5<1%7% 0 a day, more than 1 of the other 4 years-
External407%4% 1 a day, more than 3 of the other 4 years1
Network management20937%17% 7 a day, more than 1 of the other 4 years-
The operators' causes
Train faults6011%16% 2 a day, more than 1 of the other 4 years-
Traincrew9016%11% 3 a day, the least in 5 years4
Stations346%3% 1 a day, the most in 5 years-
Operations--5% 0 a day, the least in 5 years2
Operator, other81%7% 0 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)76
TGDriver59
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)52
OCSignaller including mis-routing (not ERTM /ETCS related)42
IISignalling lineside cable fault31
TWDriver adhering to company professional driving standards or policy24
MFEngineering non-technical delays associated with Engineering staff who are not based in an Engineering depot e.g. Cleaners22
RBPassengers joining/alighting21
ICTrack circuit failure (including no fault found)20
M8Technical failures above the Solebar20
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver5,405
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)4,509
OCSignaller including mis-routing (not ERTM /ETCS related)3,601
OBDelayed by signaller not applying applicable regulating policy2,204
ICTrack circuit failure (including no fault found)1,626
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,618
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,351
M8Technical failures above the Solebar1,267
IBPoints failure (including no fault found)1,229
TITraincrew rostering problem1,075