Horsham
4,207 delay minutes
The biggest share (28%) of the delay picked up at Horsham in the four weeks to 9 December 2023 came from signal, points and power faults.
86% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 173 | 4% | 8% | 6 a day, the least in 5 years | 1 |
| Signals, points and power | 1,196 | 28% | 16% | 43 a day, more than 1 of the other 4 years | 6 |
| Weather and structures | 132 | 3% | 7% | 5 a day, more than 2 of the other 4 years | 2 |
| Autumn | 67 | 2% | 7% | 2 a day, more than 1 of the other 4 years | - |
| External | 349 | 8% | 4% | 12 a day, the most in 5 years | - |
| Network management | 836 | 20% | 17% | 30 a day, more than 1 of the other 4 years | 9 |
| The operators' causes | |||||
| Train faults | 325 | 8% | 16% | 12 a day, more than 2 of the other 4 years | 2 |
| Traincrew | 816 | 19% | 11% | 29 a day, more than 2 of the other 4 years | 8 |
| Stations | 130 | 3% | 3% | 5 a day, more than 3 of the other 4 years | - |
| Operations | 58 | 1% | 5% | 2 a day, the least in 5 years | 2 |
| Operator, other | 125 | 3% | 7% | 4 a day, more than 1 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| II | Signalling lineside cable fault | 478 |
| TG | Driver | 422 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 355 |
| TI | Traincrew rostering problem | 329 |
| IB | Points failure (including no fault found) | 254 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 165 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 158 |
| XB | Vandalism or theft (including the placing of objects on the line) | 141 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 121 |
| M8 | Technical failures above the Solebar | 120 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 24,166 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 15,437 |
| TI | Traincrew rostering problem | 11,589 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 11,015 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 10,734 |
| IC | Track circuit failure (including no fault found) | 9,381 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 7,974 |
| M8 | Technical failures above the Solebar | 7,901 |
| II | Signalling lineside cable fault | 6,267 |
| IB | Points failure (including no fault found) | 6,234 |