Leaves on the Line

Horsham

HRH Sussex route
CSV JSON

4,207 delay minutes

The biggest share (28%) of the delay picked up at Horsham in the four weeks to 9 December 2023 came from signal, points and power faults.

86% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1734%8% 6 a day, the least in 5 years1
Signals, points and power1,19628%16% 43 a day, more than 1 of the other 4 years6
Weather and structures1323%7% 5 a day, more than 2 of the other 4 years2
Autumn672%7% 2 a day, more than 1 of the other 4 years-
External3498%4% 12 a day, the most in 5 years-
Network management83620%17% 30 a day, more than 1 of the other 4 years9
The operators' causes
Train faults3258%16% 12 a day, more than 2 of the other 4 years2
Traincrew81619%11% 29 a day, more than 2 of the other 4 years8
Stations1303%3% 5 a day, more than 3 of the other 4 years-
Operations581%5% 2 a day, the least in 5 years2
Operator, other1253%7% 4 a day, more than 1 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IISignalling lineside cable fault478
TGDriver422
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)355
TITraincrew rostering problem329
IBPoints failure (including no fault found)254
OCSignaller including mis-routing (not ERTM /ETCS related)165
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)158
XBVandalism or theft (including the placing of objects on the line)141
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles121
M8Technical failures above the Solebar120
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver24,166
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)15,437
TITraincrew rostering problem11,589
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.11,015
OCSignaller including mis-routing (not ERTM /ETCS related)10,734
ICTrack circuit failure (including no fault found)9,381
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure7,974
M8Technical failures above the Solebar7,901
IISignalling lineside cable fault6,267
IBPoints failure (including no fault found)6,234