Leaves on the Line

Harlech

HRL Wales route
CSV JSON

59 delay minutes

The biggest share (47%) of the delay picked up at Harlech in the four weeks to 9 December 2023 came from how the network was run.

5% of these minutes were knock-on from something that happened elsewhere first. 53% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power915%16% 0 a day, more than 2 of the other 4 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn--7% 0 a day, the least in 5 years-
External1119%4% 0 a day, the most in 5 years-
Network management2847%17% 1 a day, more than 2 of the other 4 years-
The operators' causes
Train faults814%16% 0 a day, more than 2 of the other 4 years-
Traincrew--11% 0 a day, the least in 5 years-
Stations--3% 0 a day, the least in 5 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other35%7% 0 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)28
XPBRIDGE HIT11
JTPoints failure caused by snow or frost where heaters are not fitted9
MTConfirmed train borne safety system faults (not cab based)8
VHPassenger Communication cord, door egress or emergency train alarm operated3
Since 2018
CodeWhat Network Rail loggedMinutes
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)3,126
T2Delay at unstaffed station to non-DOO train1,749
M0Confirmed train cab based safety system fault (including GSMR)971
TZOther Passenger Train Operating Company causes591
MDTechnical failures below the solebar507
M8Technical failures above the Solebar474
TH(Senior) Conductor/Train Manager408
OUDelays not Investigated by Network Rail398
TGDriver386
J0Telecom equipment radio failure (GSM-R)380