No delay was picked up at High Street (Glasgow) in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%1
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure28
MNBrake and brake systems faults; including wheel flats where no other cause had been identified18
XMExternal utility incident including gas, water mains, overhead power lines12
XHSevere heat affecting infrastructure the responsibility of Network Rail (excluding heat related speed restrictions)5
QICautioning due to railhead leaf contamination4
IHPower Supply And Distribution System Failure4
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.4
OUDelays not Investigated by Network Rail3
IBPoints failure (including no fault found)3