448 delay minutes
The biggest share (31%) of the delay picked up at Hurst Green in the four weeks to 9 December 2023 came from signal, points and power faults.
39% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 2 | <1% | 8% | 0 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 140 | 31% | 16% | 5 a day, more than 3 of the other 4 years | 1 |
| Weather and structures | 4 | <1% | 7% | 0 a day, the least in 5 years | - |
| Autumn | 23 | 5% | 7% | 1 a day, the most in 5 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 99 | 22% | 17% | 4 a day, the most in 5 years | 1 |
| The operators' causes | |||||
| Train faults | 54 | 12% | 16% | 2 a day, more than 2 of the other 4 years | 5 |
| Traincrew | 57 | 13% | 11% | 2 a day, more than 3 of the other 4 years | - |
| Stations | 12 | 3% | 3% | 0 a day, the most in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 58 | 13% | 7% | 2 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 61 |
| TG | Driver | 50 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 39 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 39 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 30 |
| IB | Points failure (including no fault found) | 27 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 25 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 22 |
| QH | Adhesion problems due to leaf contamination | 20 |
| II | Signalling lineside cable fault | 16 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 1,436 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,376 |
| IC | Track circuit failure (including no fault found) | 1,068 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 829 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 731 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 714 |
| IH | Power Supply And Distribution System Failure | 710 |
| M8 | Technical failures above the Solebar | 534 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 508 |
| MD | Technical failures below the solebar | 459 |