Haverfordwest
197 delay minutes
Most of the delay picked up at Haverfordwest in the four weeks to 9 December 2023 came from how the network was run.
2% of these minutes were knock-on from something that happened elsewhere first. 73% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 57 | 29% | 16% | 2 a day, the most in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | - | - | 7% | 0 a day, the least in 5 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 107 | 54% | 17% | 4 a day, the most in 5 years | 2 |
| The operators' causes | |||||
| Train faults | 1 | <1% | 16% | 0 a day, more than 2 of the other 4 years | - |
| Traincrew | 7 | 4% | 11% | 0 a day, more than 3 of the other 4 years | - |
| Stations | 16 | 8% | 3% | 1 a day, more than 3 of the other 4 years | - |
| Operations | 3 | 2% | 5% | 0 a day, more than 3 of the other 4 years | - |
| Operator, other | 6 | 3% | 7% | 0 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 70 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 35 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 31 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 17 |
| T2 | Delay at unstaffed station to non-DOO train | 16 |
| TH | (Senior) Conductor/Train Manager | 7 |
| IH | Power Supply And Distribution System Failure | 6 |
| VE | Ticket irregularities or refusals to pay | 6 |
| IL | Token equipment failure (including no fault found) | 3 |
| RD | Attaching/detaching/shunter/watering | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZY | Univestigated station overtime System Roll-up Only | 3,204 |
| T2 | Delay at unstaffed station to non-DOO train | 590 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 508 |
| IA | Signal failure (including no fault found) | 345 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 259 |
| II | Signalling lineside cable fault | 211 |
| IC | Track circuit failure (including no fault found) | 180 |
| OU | Delays not Investigated by Network Rail | 178 |
| M8 | Technical failures above the Solebar | 177 |
| IB | Points failure (including no fault found) | 165 |