Hyndland
583 delay minutes
The biggest share (18%) of the delay picked up at Hyndland in the four weeks to 9 December 2023 came from other operator causes.
83% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 30 | 5% | 8% | 1 a day, the least in 5 years | - |
| Signals, points and power | 52 | 9% | 16% | 2 a day, more than 1 of the other 4 years | 6 |
| Weather and structures | 24 | 4% | 7% | 1 a day, the most in 5 years | 1 |
| Autumn | 104 | 18% | 7% | 4 a day, the most in 5 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 60 | 10% | 17% | 2 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 41 | 7% | 16% | 1 a day, the least in 5 years | 1 |
| Traincrew | 70 | 12% | 11% | 3 a day, the most in 5 years | - |
| Stations | 19 | 3% | 3% | 1 a day, more than 3 of the other 4 years | - |
| Operations | 78 | 13% | 5% | 3 a day, the most in 5 years | - |
| Operator, other | 106 | 18% | 7% | 4 a day, the most in 5 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 73 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 72 |
| TG | Driver | 70 |
| TZ | Other Passenger Train Operating Company causes | 46 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 32 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 32 |
| OE | Failure to lay Sandite or operate Railhead Conditioning train as programmed | 31 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 26 |
| M8 | Technical failures above the Solebar | 21 |
| VB | Vandalism or theft | 21 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 3,506 |
| TG | Driver | 2,998 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 2,552 |
| JB | Reactionary Delay to 'P' coded TSRs | 2,341 |
| M8 | Technical failures above the Solebar | 2,143 |
| IC | Track circuit failure (including no fault found) | 1,373 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 1,343 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,290 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 1,231 |
| M7 | Door and Door system faults | 1,173 |