Invergordon
128 delay minutes
The biggest share (23%) of the delay picked up at Invergordon in the four weeks to 9 December 2023 came from track faults.
82% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 29 | 23% | 8% | 1 a day, the most in 5 years | - |
| Signals, points and power | 11 | 9% | 16% | 0 a day, the least in 5 years | - |
| Weather and structures | 26 | 20% | 7% | 1 a day, more than 1 of the other 4 years | - |
| Autumn | 4 | 3% | 7% | 0 a day, more than 1 of the other 4 years | - |
| External | 9 | 7% | 4% | 0 a day, more than 2 of the other 4 years | 2 |
| Network management | 22 | 17% | 17% | 1 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 12 | 9% | 16% | 0 a day, the least in 5 years | - |
| Traincrew | 10 | 8% | 11% | 0 a day, more than 1 of the other 4 years | - |
| Stations | 2 | 2% | 3% | 0 a day, the most in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 4 | 3% | 7% | 0 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 27 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 15 |
| IK | Telecom equipment failure (including no fault found) | 11 |
| JK | Flooding not due to exceptional weather | 11 |
| ZU | No Cause Identified After investigation by both Parties | 11 |
| M8 | Technical failures above the Solebar | 10 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 9 |
| TG | Driver | 7 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 5 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZU | No Cause Identified After investigation by both Parties | 1,551 |
| MD | Technical failures below the solebar | 1,029 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 924 |
| TG | Driver | 731 |
| IB | Points failure (including no fault found) | 571 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 530 |
| I0 | Telecom equipment legacy radio failures (RETB) | 390 |
| M8 | Technical failures above the Solebar | 366 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 356 |
| JB | Reactionary Delay to 'P' coded TSRs | 334 |