Leaves on the Line

Invergordon

IGD Scotland route
CSV JSON

128 delay minutes

The biggest share (23%) of the delay picked up at Invergordon in the four weeks to 9 December 2023 came from track faults.

82% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track2923%8% 1 a day, the most in 5 years-
Signals, points and power119%16% 0 a day, the least in 5 years-
Weather and structures2620%7% 1 a day, more than 1 of the other 4 years-
Autumn43%7% 0 a day, more than 1 of the other 4 years-
External97%4% 0 a day, more than 2 of the other 4 years2
Network management2217%17% 1 a day, more than 1 of the other 4 years-
The operators' causes
Train faults129%16% 0 a day, the least in 5 years-
Traincrew108%11% 0 a day, more than 1 of the other 4 years-
Stations22%3% 0 a day, the most in 5 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other43%7% 0 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.27
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)15
IKTelecom equipment failure (including no fault found)11
JKFlooding not due to exceptional weather11
ZUNo Cause Identified After investigation by both Parties11
M8Technical failures above the Solebar10
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)9
TGDriver7
I8Animal Strike or Incursion within the control of Network Rail5
MPRail / wheel interface, adhesion problems (including ice on the running rail)4
Since 2018
CodeWhat Network Rail loggedMinutes
ZUNo Cause Identified After investigation by both Parties1,551
MDTechnical failures below the solebar1,029
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions924
TGDriver731
IBPoints failure (including no fault found)571
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)530
I0Telecom equipment legacy radio failures (RETB)390
M8Technical failures above the Solebar366
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail356
JBReactionary Delay to 'P' coded TSRs334