Inverkeithing
910 delay minutes
The biggest share (18%) of the delay picked up at Inverkeithing in the four weeks to 9 December 2023 came from autumn leaves.
28% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 3 | <1% | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 103 | 11% | 16% | 4 a day, more than 3 of the other 4 years | - |
| Weather and structures | 45 | 5% | 7% | 2 a day, more than 2 of the other 4 years | - |
| Autumn | 168 | 18% | 7% | 6 a day, more than 2 of the other 4 years | - |
| External | 30 | 3% | 4% | 1 a day, more than 2 of the other 4 years | - |
| Network management | 44 | 5% | 17% | 2 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 84 | 9% | 16% | 3 a day, the least in 5 years | 1 |
| Traincrew | 65 | 7% | 11% | 2 a day, more than 1 of the other 4 years | 1 |
| Stations | 69 | 8% | 3% | 2 a day, more than 1 of the other 4 years | - |
| Operations | 156 | 17% | 5% | 6 a day, the most in 5 years | - |
| Operator, other | 143 | 16% | 7% | 5 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 151 |
| Q3 | NZ Pumps T | 118 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 81 |
| MD | Technical failures below the solebar | 70 |
| TT | Leaf fall Neutral | 69 |
| TG | Driver | 60 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 49 |
| RB | Passengers joining/alighting | 42 |
| QH | Adhesion problems due to leaf contamination | 30 |
| I5 | Possession over-run from planned work | 25 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 7,722 |
| MD | Technical failures below the solebar | 4,052 |
| TG | Driver | 3,718 |
| Q3 | NZ Pumps T | 2,363 |
| RB | Passengers joining/alighting | 2,192 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,098 |
| M8 | Technical failures above the Solebar | 1,821 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 1,511 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 1,476 |
| IC | Track circuit failure (including no fault found) | 1,407 |