Leaves on the Line

Inverkeithing

INK Scotland route
CSV JSON

910 delay minutes

The biggest share (18%) of the delay picked up at Inverkeithing in the four weeks to 9 December 2023 came from autumn leaves.

28% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track3<1%8% 0 a day, the least in 5 years-
Signals, points and power10311%16% 4 a day, more than 3 of the other 4 years-
Weather and structures455%7% 2 a day, more than 2 of the other 4 years-
Autumn16818%7% 6 a day, more than 2 of the other 4 years-
External303%4% 1 a day, more than 2 of the other 4 years-
Network management445%17% 2 a day, the least in 5 years-
The operators' causes
Train faults849%16% 3 a day, the least in 5 years1
Traincrew657%11% 2 a day, more than 1 of the other 4 years1
Stations698%3% 2 a day, more than 1 of the other 4 years-
Operations15617%5% 6 a day, the most in 5 years-
Operator, other14316%7% 5 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)151
Q3NZ Pumps T118
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure81
MDTechnical failures below the solebar70
TTLeaf fall Neutral69
TGDriver60
MPRail / wheel interface, adhesion problems (including ice on the running rail)49
RBPassengers joining/alighting42
QHAdhesion problems due to leaf contamination30
I5Possession over-run from planned work25
Since 2018
CodeWhat Network Rail loggedMinutes
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)7,722
MDTechnical failures below the solebar4,052
TGDriver3,718
Q3NZ Pumps T2,363
RBPassengers joining/alighting2,192
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2,098
M8Technical failures above the Solebar1,821
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions1,511
MPRail / wheel interface, adhesion problems (including ice on the running rail)1,476
ICTrack circuit failure (including no fault found)1,407