CSV JSON

443 delay minutes

The biggest share (29%) of the delay picked up at Insch in the four weeks to 9 December 2023 came from weather and structures.

64% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track297%8% 1 a day, more than 3 of the other 4 years-
Signals, points and power6114%16% 2 a day, more than 1 of the other 4 years-
Weather and structures12829%7% 5 a day, more than 2 of the other 4 years1
Autumn143%7% 1 a day, more than 2 of the other 4 years-
External245%4% 1 a day, more than 2 of the other 4 years-
Network management4711%17% 2 a day, more than 1 of the other 4 years-
The operators' causes
Train faults6615%16% 2 a day, the most in 5 years-
Traincrew5312%11% 2 a day, the most in 5 years-
Stations--3% 0 a day, the least in 5 years-
Operations72%5% 0 a day, more than 3 of the other 4 years-
Operator, other143%7% 1 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
X9Points failure caused by severe snow or ice where heaters are fitted and working as designed77
TGDriver49
IKTelecom equipment failure (including no fault found)35
MNBrake and brake systems faults; including wheel flats where no other cause had been identified32
IRBroken/cracked/twisted/buckled/flawed rail29
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions25
ZUNo Cause Identified After investigation by both Parties24
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure23
ICTrack circuit failure (including no fault found)17
MWWeather - effect on T&RS equipment15
Since 2018
CodeWhat Network Rail loggedMinutes
OCSignaller including mis-routing (not ERTM /ETCS related)3,110
ZUNo Cause Identified After investigation by both Parties2,444
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions1,918
MDTechnical failures below the solebar969
TGDriver942
M8Technical failures above the Solebar782
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure769
IBPoints failure (including no fault found)722
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure597
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)578