Insch
443 delay minutes
The biggest share (29%) of the delay picked up at Insch in the four weeks to 9 December 2023 came from weather and structures.
64% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 29 | 7% | 8% | 1 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 61 | 14% | 16% | 2 a day, more than 1 of the other 4 years | - |
| Weather and structures | 128 | 29% | 7% | 5 a day, more than 2 of the other 4 years | 1 |
| Autumn | 14 | 3% | 7% | 1 a day, more than 2 of the other 4 years | - |
| External | 24 | 5% | 4% | 1 a day, more than 2 of the other 4 years | - |
| Network management | 47 | 11% | 17% | 2 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 66 | 15% | 16% | 2 a day, the most in 5 years | - |
| Traincrew | 53 | 12% | 11% | 2 a day, the most in 5 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | 7 | 2% | 5% | 0 a day, more than 3 of the other 4 years | - |
| Operator, other | 14 | 3% | 7% | 1 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X9 | Points failure caused by severe snow or ice where heaters are fitted and working as designed | 77 |
| TG | Driver | 49 |
| IK | Telecom equipment failure (including no fault found) | 35 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 32 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 29 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 25 |
| ZU | No Cause Identified After investigation by both Parties | 24 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 23 |
| IC | Track circuit failure (including no fault found) | 17 |
| MW | Weather - effect on T&RS equipment | 15 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 3,110 |
| ZU | No Cause Identified After investigation by both Parties | 2,444 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 1,918 |
| MD | Technical failures below the solebar | 969 |
| TG | Driver | 942 |
| M8 | Technical failures above the Solebar | 782 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 769 |
| IB | Points failure (including no fault found) | 722 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 597 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 578 |