Leaves on the Line

Inverness

INV Scotland route
CSV JSON

1,296 delay minutes

The biggest share (30%) of the delay picked up at Inverness in the four weeks to 9 December 2023 came from weather and structures.

61% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track151%8% 1 a day, the least in 5 years-
Signals, points and power967%16% 3 a day, more than 1 of the other 4 years-
Weather and structures39030%7% 14 a day, the most in 5 years-
Autumn595%7% 2 a day, more than 2 of the other 4 years-
External222%4% 1 a day, more than 1 of the other 4 years1
Network management19215%17% 7 a day, more than 1 of the other 4 years18
The operators' causes
Train faults30724%16% 11 a day, more than 2 of the other 4 years8
Traincrew13010%11% 5 a day, more than 3 of the other 4 years1
Stations12<1%3% 0 a day, more than 2 of the other 4 years-
Operations141%5% 1 a day, the most in 5 years-
Operator, other595%7% 2 a day, more than 1 of the other 4 years2

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
X9Points failure caused by severe snow or ice where heaters are fitted and working as designed129
TGDriver93
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions82
M8Technical failures above the Solebar80
MDTechnical failures below the solebar69
MNBrake and brake systems faults; including wheel flats where no other cause had been identified69
JKFlooding not due to exceptional weather67
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)62
MPRail / wheel interface, adhesion problems (including ice on the running rail)59
Q3NZ Pumps T59
Since 2018
CodeWhat Network Rail loggedMinutes
ZUNo Cause Identified After investigation by both Parties8,061
MDTechnical failures below the solebar6,200
TGDriver5,015
M8Technical failures above the Solebar3,898
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions3,626
IRBroken/cracked/twisted/buckled/flawed rail2,184
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,933
IBPoints failure (including no fault found)1,896
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,852
MCDiesel Loco failure, defect, attention1,731