Inverness
1,296 delay minutes
The biggest share (30%) of the delay picked up at Inverness in the four weeks to 9 December 2023 came from weather and structures.
61% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 15 | 1% | 8% | 1 a day, the least in 5 years | - |
| Signals, points and power | 96 | 7% | 16% | 3 a day, more than 1 of the other 4 years | - |
| Weather and structures | 390 | 30% | 7% | 14 a day, the most in 5 years | - |
| Autumn | 59 | 5% | 7% | 2 a day, more than 2 of the other 4 years | - |
| External | 22 | 2% | 4% | 1 a day, more than 1 of the other 4 years | 1 |
| Network management | 192 | 15% | 17% | 7 a day, more than 1 of the other 4 years | 18 |
| The operators' causes | |||||
| Train faults | 307 | 24% | 16% | 11 a day, more than 2 of the other 4 years | 8 |
| Traincrew | 130 | 10% | 11% | 5 a day, more than 3 of the other 4 years | 1 |
| Stations | 12 | <1% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | 14 | 1% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 59 | 5% | 7% | 2 a day, more than 1 of the other 4 years | 2 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X9 | Points failure caused by severe snow or ice where heaters are fitted and working as designed | 129 |
| TG | Driver | 93 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 82 |
| M8 | Technical failures above the Solebar | 80 |
| MD | Technical failures below the solebar | 69 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 69 |
| JK | Flooding not due to exceptional weather | 67 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 62 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 59 |
| Q3 | NZ Pumps T | 59 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZU | No Cause Identified After investigation by both Parties | 8,061 |
| MD | Technical failures below the solebar | 6,200 |
| TG | Driver | 5,015 |
| M8 | Technical failures above the Solebar | 3,898 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 3,626 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 2,184 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,933 |
| IB | Points failure (including no fault found) | 1,896 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,852 |
| MC | Diesel Loco failure, defect, attention | 1,731 |