250 delay minutes

The biggest share (37%) of the delay picked up at Irvine in the four weeks to 9 December 2023 came from how the network was run.

54% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track31%8%-
Signals, points and power4116%16%-
Weather and structures31%7%-
Autumn4518%7%-
External--4%-
Network management9337%17%2
The operators' causes
Train faults125%16%-
Traincrew94%11%-
Stations166%3%-
Operations--5%-
Operator, other2911%7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
QMTrain schedule/STP Process including erroneous simplifiers46
QNVSTP Schedule/ VSTP Process (TSI created schedule)30
Q3NZ Pumps T29
ICTrack circuit failure (including no fault found)26
MPRail / wheel interface, adhesion problems (including ice on the running rail)18
OEFailure to lay Sandite or operate Railhead Conditioning train as programmed16
IASignal failure (including no fault found)12
TTLeaf fall Neutral11
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)10
RCre-booked assistance for a person with reduced mobility joining/alighting,10
Since 2018
CodeWhat Network Rail loggedMinutes
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)522
ICTrack circuit failure (including no fault found)361
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail267
IBPoints failure (including no fault found)257
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)256
IASignal failure (including no fault found)230
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure229
QMTrain schedule/STP Process including erroneous simplifiers207
OCSignaller including mis-routing (not ERTM /ETCS related)201
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions197