250 delay minutes
The biggest share (37%) of the delay picked up at Irvine in the four weeks to 9 December 2023 came from how the network was run.
54% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | 3 | 1% | 8% | - |
| Signals, points and power | 41 | 16% | 16% | - |
| Weather and structures | 3 | 1% | 7% | - |
| Autumn | 45 | 18% | 7% | - |
| External | - | - | 4% | - |
| Network management | 93 | 37% | 17% | 2 |
| The operators' causes | ||||
| Train faults | 12 | 5% | 16% | - |
| Traincrew | 9 | 4% | 11% | - |
| Stations | 16 | 6% | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | 29 | 11% | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QM | Train schedule/STP Process including erroneous simplifiers | 46 |
| QN | VSTP Schedule/ VSTP Process (TSI created schedule) | 30 |
| Q3 | NZ Pumps T | 29 |
| IC | Track circuit failure (including no fault found) | 26 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 18 |
| OE | Failure to lay Sandite or operate Railhead Conditioning train as programmed | 16 |
| IA | Signal failure (including no fault found) | 12 |
| TT | Leaf fall Neutral | 11 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 10 |
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 10 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 522 |
| IC | Track circuit failure (including no fault found) | 361 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 267 |
| IB | Points failure (including no fault found) | 257 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 256 |
| IA | Signal failure (including no fault found) | 230 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 229 |
| QM | Train schedule/STP Process including erroneous simplifiers | 207 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 201 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 197 |